Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Douglas Project Strandline Systems, Wimmera Region, Western Victoria

    By D Judkins N OÆLoughlin

    "Basin Minerals Limited commenced exploring for conventional strandline hosted mineral sands (rutile, ilmenite and zircon) deposits in the Murray Basin in April 1997. This has resulted in the discover

    Jan 1, 2001

  • AUSIMM
    Refining Bullion at Mount Morgan, Queensland

    FOR some years after the erection of the first chlorination plant at Mount Morgan the ore sent to the works for treatment was mined entirely from the oxidized zone; consequently, the bullion recovered

    Jan 1, 1911

  • AUSIMM
    Planning for Commercial Operation of the Honeymoon ISL Uranium Project

    A recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197

    Jan 1, 2002

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018

  • AUSIMM
    Environmental Reclamation Practice in a Brazilian Coal Mine ù An Economical Approach

    By J F. Costa, A Grigorieff

    Coal mining reclamation is a worldwide concern. This paper presents a Brazilian example where the economic aspects of reclamation are considered. The basic goal of the study is to transform the reclam

    Jan 1, 2005

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression Systems

    By J J. L du Plessis, A Spaeth

    The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we

    Aug 31, 2015

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Vivien Mine modelling back analysis to forecast ground conditions and ground support

    By J Player, P Mikula, G Sweby

    A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre

    Nov 29, 2022

  • AUSIMM
    Volume and Structural Changes Occuring During the Isothermal and Non-Isothermal Reduction of High Grade Hematite Pellets

    By Morrison AL

    The volume changes occurring during the reduction by hydrogen of single, high-grade hematite pellets under isothermal and non- isothermal conditions were investigated using a time-lapse photographi

    Jan 1, 1980

  • AUSIMM
    Perimeter Blast Design at Mt Whaleback Mine, Newman, Western Australia

    The Mt Whaleback open cut mine South Wall is, in part, developed as an unbenched dip slope. The remainder of the rock slope consists of asymetrical overturned folds which have been locally truncated

    Jan 1, 1989

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • AUSIMM
    Technical Challenges Faced With Extracting a Transverse Pillar at Mount Isa Mines, Xstrata Copper

    By A Winchester, D Grant

    The massive 1100 Orebody in Mount IsaÆs X41 Copper Mine has been extracted over the last 40 years form north to south utilising sublevel open stoping methods.De velopment has continually stepped ahead

    Jan 1, 2005

  • AUSIMM
    Influence of iron ore chemistry and mineralogy on sticking and breakage of pellets inside shaft furnace

    By M I. Pownceby, A Guiraud, S Purohit

    Sticking and breakage of iron ore pellets during high temperature reduction can result in several operational challenges during shaft furnace ironmaking. With the shift to H2-based DRI processes and d

    Sep 18, 2023

  • AUSIMM
    Application study of UAV technology in tailings pond monitoring

    By T Zhao, K Wang, Z Zhang

    Tailings pond safety monitoring is vital for preventing dam failures and ensuring environmental safety. Unmanned Aerial Vehicles (UAVs) can enhance tailings pond monitoring with flexible operational c

    Sep 1, 2024

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022