Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of the Broken Hill Lead-Silver-Zinc Industry

    Before presentIng my address I wish to acknowledge the honour which has been conferred on me by my appointment to the position of President of the Australasian Institute of Mining and Metallurgy.It is

    Jan 1, 1940

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    The Coolest Job There Ever Was

    I once read an æarticleÆ in FHM Magazine entitled æThe Coolest Jobs There Ever WasÆ. It was about a group of guys who were pursuing careers that any person on the planet would just kill for. I distinc

    Jan 1, 2005

  • AUSIMM
    The Mining of J Lens

    By Reeves I. And Farquhar J, Pearce S

    The irregular shape of the Rosebery orebody, coupled with the inconsistencies in grade over short strike lengths, has meant stoping blocks have had to be small to combat dilution and stability probl

    Jan 1, 1993

  • AUSIMM
    Copper Price Uncertainties – Chaos Theory to Manage Risks in Mining Projects

    By C Tapia Cortez, C Sammut, S Saydam, J Coulton

    ‘Like every other commodity, the value of the metals is subject to variation’ (Ricardo, 1817). Mineral commodity price uncertainties have always been a significant issue in mining business due to the

    Nov 4, 2015

  • AUSIMM
    Critical Apraisal of Pillar Design as Required by Coal Mines Regulations of India Vis-Vis Latest-Rockmechanics Formulae

    By Singh DP, Singh TN

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae. Equivalent material modelling was the appro

    Jan 1, 1992

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    The Connection between Evaporites and Iron Oxide-apatite Deposits, Yangtze River, China – Laser Ablation Inductively Coupled Plasma Mass Spectrometry Analysis of Na, S, Cl and Br in Fluid Inclusions

    By A Audétat, W T. Li

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Middle and Lower Yangtze River metallogenic belt is one of the most important polymetal

    Mar 18, 2015

  • AUSIMM
    Understanding the Susceptibility of the ZA-27 Zinc Base Alloy to mAcrosegregation and Inverted Pipe Formation

    By Nava-Vasquez E, Torres-Torres J, Mendez-Nonell J

    The ZA-27 zinc base alloy was poured into cylindrical moulds and solidified under different conditions ie normal freezing and unidirectional freezing. In addition a cylindrical ingot with rheocast m

    Jan 1, 1993

  • AUSIMM
    Lack of Alignment between Regulation of Surface Water Management in Coal Mining and Coal Seam Gas

    By E Coffison, M Gibbs, C Bennett

    The sustainable management of surface water associated with coal mining and coal seam gas projects is a considerable factor affecting the global competitiveness of these resource companies operating i

    Nov 26, 2013

  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Aspects of Design and In-Situ Testing for the Murl Rock Tunnels

    By Bennet A. G

    An overall review of the selection of rock strength and deformation characteris- tics for the design of the Melbourne Under- qround Rail Loop (MIJRL) rock tunnels is presented. Particular emphasis is

    Jan 1, 1981

  • AUSIMM
    Efficiency of the Detritor Mills at Zinifex Century Mine

    By D P. Obeng, L Reemeyer, R Holmes

    The Zinifex Century Mine employs a large number of Detritor mills for fine and ultra-fine grinding to liberate silica and sphalerite at 80 per cent passing 7.5 microns before final zinc flotation. A j

    Jan 1, 2007

  • AUSIMM
    Achieving Internationally Competitive Rail Freight for Coal - The Hunter Valley Rail Project

    The Hunter Valley Rail Project (HVRP) represents most of the coal producers using the Hunter Valley Rail System in NSW to haul coal to the port of Newcastle. This system carries over 70 per cent of

    Jan 1, 1995

  • AUSIMM
    Dump Leach Operation at Wiluna Western Australia

    General Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min

    Jan 1, 1994

  • AUSIMM
    Rare Earth Element Behaviour and Hydrothermal Alteration, Lihir Island, Papua New Guinea

    A thick sequence of alkaline intrusions and volcanic rocks underlies a Quaternary caldera on Liliir Island. The sequence is host to a still active sub-aerial hydrothermal system and associated epither

    Jan 1, 1990

  • AUSIMM
    Application of foam as a ventilation control for spontaneous combustion management in a longwall goaf

    By O Salisbury

    Ingress of air into the longwall goaf environment needs to be managed appropriately to reduce the risk of creating a spontaneous combustion event. The maingate goaf edge is an area of particular conce

    Oct 12, 2022

  • AUSIMM
    Exploring Community Involvement in a Major Infrastructure Project û Case of an Oil Pipeline in Eastern Siberia

    Addressing community concerns in relation to an economic activity, particularly when it causes significant community impacts, is especially important for the development of extractive industry project

    Jan 1, 2009

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Non-renewable Energy Resources of Queensland

    The non-renewable energy resources of Queensland comprise coal, petroleum (oil and gas), oil shale and uranium. Coal is widely distributed., and has been developed extensively both for export and f

    Jan 1, 1979