Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085

    At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3

    Mar 1, 2010

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Hydraulic Rock Drills in Production and Development

    The paper covers the history and develop- ment of electrical and diesel-powered hydrau- lic percussion rock drills. It examines main design aspects and problems encountered in pro- ducing an efficien

    Jan 1, 1978

  • AUSIMM
    SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success story

    By D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane

    The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and

    Aug 29, 2018

  • AUSIMM
    Iron Sinter Process Control Using X-ray Diffraction

    By U König, N Norberg

    Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,

    Jul 13, 2015

  • AUSIMM
    An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modelling

    By J Harding, S Munro, R A. Bearman

    Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin

    Aug 24, 2022

  • AUSIMM
    The Nova Operation: mining, technology and a look into the EV future

    By P Ring, B Cooper, C Carr, G Laing

    The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o

    Mar 15, 2021

  • AUSIMM
    The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II

    By Baker G

    The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then

    Jan 1, 1953

  • AUSIMM
    Using Borehole Radar to Refine Orebody Interpretations in a Narrow Vein Gold Deposit

    By G Morgan, C Kemp

    In December 2010, a trial of borehole radar technology was conducted to test the usefulness of the technique in better refining the position and geometry of narrow vein orebodies away from the primary

    Mar 26, 2012

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    Investigating the Influence of Meso-2,3-Dimercaptosuccinic Acid on Thiosulfate Leaching of Bulk Gold Electrodes

    By M Uceda, E Guerra, Y Choi, J L. Shepherd

    In this paper we describe the leaching characteristics of pure gold in thiosulfate solutions that contain a known chelator; meso-2,3-dimercaptosuccinic acid (DMSA). The interfacial and chemical charac

    Sep 26, 2013

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Discovery and Geology of the McPhee Creek Iron Deposit, Northern Pilbara, Western Australia

    By J D. Goldsworthy

    The McPhee Creek bedded iron deposit is a recent discovery made by Giralia Resources NL (Giralia) in the northern Pilbara of Western Australia. The deposit lies 30 km north of the town of Nullagine al

    Jul 11, 2011

  • AUSIMM
    Evaluating the Effects of Non-coaxial Charges for Contour Blasting

    By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt

    Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a

    Aug 24, 2015

  • AUSIMM
    People-An Employer's View

    Rather like the mythical "Economic Man" "an employer" in this context must necessarily be an abstraction, and the views possessed by such an abstraction, a composite of many views known to have bee

    Jan 1, 1982

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    A More Holistic View of Mill Liner Management

    By N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor

    The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin

    Oct 29, 2012

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013