Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western AustraliaBy P J. Howard
Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.
Jul 11, 2011
-
Hydraulic Rock Drills in Production and DevelopmentThe paper covers the history and develop- ment of electrical and diesel-powered hydrau- lic percussion rock drills. It examines main design aspects and problems encountered in pro- ducing an efficien
Jan 1, 1978
-
SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success storyBy D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane
The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and
Aug 29, 2018
-
Iron Sinter Process Control Using X-ray DiffractionBy U König, N Norberg
Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,
Jul 13, 2015
-
An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modellingBy J Harding, S Munro, R A. Bearman
Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin
Aug 24, 2022
-
The Nova Operation: mining, technology and a look into the EV futureBy P Ring, B Cooper, C Carr, G Laing
The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o
Mar 15, 2021
-
The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, IIBy Baker G
The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then
Jan 1, 1953
-
Using Borehole Radar to Refine Orebody Interpretations in a Narrow Vein Gold DepositBy G Morgan, C Kemp
In December 2010, a trial of borehole radar technology was conducted to test the usefulness of the technique in better refining the position and geometry of narrow vein orebodies away from the primary
Mar 26, 2012
-
Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite SmelterBy H Weitz
Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo
Oct 5, 2011
-
Investigating the Influence of Meso-2,3-Dimercaptosuccinic Acid on Thiosulfate Leaching of Bulk Gold ElectrodesBy M Uceda, E Guerra, Y Choi, J L. Shepherd
In this paper we describe the leaching characteristics of pure gold in thiosulfate solutions that contain a known chelator; meso-2,3-dimercaptosuccinic acid (DMSA). The interfacial and chemical charac
Sep 26, 2013
-
Oversize Reduction Project at the Iron Ore Company of CanadaBy R Pinksen
The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque
Jul 11, 2011
-
Discovery and Geology of the McPhee Creek Iron Deposit, Northern Pilbara, Western AustraliaBy J D. Goldsworthy
The McPhee Creek bedded iron deposit is a recent discovery made by Giralia Resources NL (Giralia) in the northern Pilbara of Western Australia. The deposit lies 30 km north of the town of Nullagine al
Jul 11, 2011
-
Evaluating the Effects of Non-coaxial Charges for Contour BlastingBy J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt
Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a
Aug 24, 2015
-
People-An Employer's ViewRather like the mythical "Economic Man" "an employer" in this context must necessarily be an abstraction, and the views possessed by such an abstraction, a composite of many views known to have bee
Jan 1, 1982
-
Process Development for the Marampa Iron Ore Tailings Project, Sierra LeoneBy P Dunn
Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi
Jul 11, 2011
-
A More Holistic View of Mill Liner ManagementBy N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor
The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin
Oct 29, 2012
-
Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin MineBy M S. Kizil, T OÆConnor
It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At
Jul 1, 2013