Search Documents

  • AUSIMM
    The Karangahake Gold-Silver Deposit

    The Karangahake gold-silver deposit is located 11 km west of Waihi in the southern part of the Hauraki Goldfield. Historically it was the second largest bullion producer in the goldfield with a past p

    Jan 1, 1987

  • CIM
    Effect of Gravity Recovery on Overall Plant Recovery. Sadiola – A Case Study (998ef7ed-734f-4917-a31d-ff2d1cd09bd4)

    By Craig Naudé

    "An enhanced gravity concentrator was installed in conjunction with an Intensive Leach Reactor at the Sadiola plant in Mali last year and commissioned in Dec 2007.There has been much debate over the y

    Jan 1, 2009

  • AUSIMM
    The Oxide Ore Treatment Plant, Mount Morgan

    This modern plant was installed with the object of treating all oxide ore and payable dump material by the cyanide process.The plant is located on a ridge on the eastern side of Linda Gully. The mill

    Jan 1, 1939

  • SME
    The Tai Po to Butterfly Valley Aqueduct in Hong Kong

    By Derek. C. Arnold

    In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and

    Jan 1, 1999

  • CIM
    Performance of the Tankcell® E500 at the Kevitsa Mine

    By Ben Murphy, Tomi Maksimainen, Antti Rinne, Ishmael Muzinda, Toni Mattsson

    "A 500m3 flotation cell was commissioned during 2014 at the Kevitsa Mine in northern Finland working as the first rougher in the copper flotation circuit. Treating around 850tph with an average grade

    Jan 1, 2016

  • SAIMM
    Slope Monitoring Strategy At PPRust Open Pit Operation

    By M. J. Little

    Potgietersrust Platinums Ltd (PPRust) is Anglo Platinum?s only open pit operation. The major slope stability concern at PPRust is rapid, small-scale brittle failure on the west wall of Sandsloot open

    Jan 1, 2006

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • NIOSH
    OFR-26-80 Low Velocity Performance Of Anemometers

    By L. P. Purtell

    The performance of ten anemometers of several types has been measured at low air speeds. Multiple calibration runs provided sufficient data for measuring random error about the mean calibration curve

    Jan 1, 1979

  • ISEE
    Vibration Spectral Mapping

    By Gordon M. Matheson, Douglas A. Anderson, David K. Miller

    "Traditionally, analysis of vibrations from blasting has been focused on peak particle velocity fordetermining the likelihood of both annoyance and damage. The US Bureau of Mines, in RI 8507,indicated

    Jan 1, 1997

  • SAIMM
    Improving processing by adaption to conditional geostatistical simulation of block compositions

    "Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s

    Jan 1, 2015

  • SME
    Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study

    By James M. Harrington, A. Azra Bilgin, JoAnn Silverstein

    The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr

    Jan 1, 2005

  • NIOSH
    RI 4502 Report Of Research And Technologic Work On Explosives, Explosions, And Flames Fiscal Years 1947 And 1948

    By Bernard Lewis

    This report on the research and technical studies conducted by the Explosives Branch of the Bureau of Mines covers the 2-year period July 1, 1946, to June 30, 1948. A report for the fiscal year 1947 w

    Jan 1, 1949

  • IIMP
    Aplicaciones de análisis de cuencas sedimentarias a la serie cretacica en el área de Cajamarca

    By Zenón Quispe

    El presente trabajo describe la importancia de la aplicación de técnicas de análisis de cuencas sedimentarias en la exploración de minerales del área de Cajamarca. Para ello, se determinaron los espe

    Sep 9, 2007

  • SME
    Mining Applications Of Small Disc Cutters

    By J. E. Friant

    Until 1956, drill and blast was the only way to excavate rock. In that year, a tunneling machine using disc type cutters economically bored a small Toronto tunnel. Its amazing 105 ft/day set a new w

    Jan 1, 2002

  • AIME
    Safety Progress in the Petroleum Industry

    By H. C. Fowler, G. B. Shea

    MODERN industry's incessant demands for increased operating efficiency and lower costs require that hazards attending all occupations be reduced to a minimum. Reduction of the inevitable losses t

    Jan 1, 1933

  • AUSIMM
    Fragmentation Characteristics of Iron Ores from Anshan, China

    Fragmentation Characteristics of Iron Ores from Anshan, China

    Sep 13, 2010

  • AUSIMM
    A Modified Laboratory Concentrating Table

    Small scale' table concentration tests have many critics. Many metallurgists consider that such tests are of problematical value because of the difficulties involved in conducting and interpretin

    Jan 1, 1954

  • CIM
    Two Contrasting Iron Deposits in the Precambrian Mineral Belt of Cameroon, West Africa

    By E. M. Shemang, C. E. Suh, L. Mbinkar, University of Yaounde

    "Two iron deposits within the Precambrian mineral belt of Cameroon are described in detail for the first time: the Archean Metzimevin replacement iron deposit enclosed in Fe-enriched itabirite, and th

    Jan 1, 2008

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • AUSIMM
    The Drainage of the New Chum Line of Reef

    One of the chief drawbacks to Bendigo mining always has been the difficulty of draining the mines in an equitable manner, so that each company or mine owner bears the properly share. The trouble seems

    Jan 1, 1902