Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting ConditionsFor small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not
Jan 1, 1979
-
Maintenance Contract on Cat 785 Trucks Works Well at Round MountainBy J. B. Rasmussen
As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle
Jan 1, 1991
-
Concentrator Expansion at Freeport Indonesia’s Grasberg OperationsBy Rick Coleman
PT Freeport Indonesia’s (PTFI) latest expansion has increased total mill throughput to 125kt/d (137,700 stpd). The most recent expansion included the installation of a semiautogenous mill (SAG) desig
Jan 1, 1996
-
Practical Optimization Strategies for Coal-Washing Plants – Preprint 97-70By R. P. King
The MODSIM mineral processing plant simultor is used to find optimal combinations of target separation specific gravities in a typical modem coal washing plant. A plant that is set up with these optim
Feb 24, 1997
-
Ground Freezing Under the Most Adverse Conditions: Moving GroundwaterBy Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin
Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result
Jan 1, 2007
-
Classification of quartz veins in turbiditehosted gold deposits, greenschist facies, eastern Nova ScotiaBy S. J. Haynes
"This paper documents the characteristics of the different quartz veins, and their relation to gold, in the turbiditic Meguma domain of eastern Nova Scotia. Eleven different types have been distinguis
Jan 1, 1987
-
The Improvements To Copper Casting Machine For FerroalloysBy A. More, J. M. Míguez, J. Bullón
In 2000 Ferroatlantica started a project with the aim to develop a new casting machine for silicon and other ferroalloys. Until now, it has been cast more than 25.000 tons of silicon for the chemical
Jan 1, 2007
-
A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop CollieryBy R. Lombard
"Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po
Jan 1, 2015
-
Evaluation of Three-Dimensional Laser Scanning and Photogrammetry Systems for Terrestrial Surveying and Deformation Monitoring of Rock Faces and Highwalls in Mining OperationsThis study explores two evolving 3D surveying technologies, photogrammetry and laser scanning, and applies them to deformation monitoring of rock faces and mine highwalls. A quantitative analysis focu
Jan 1, 2009
-
The Mineral Composition of the Black Star Copper Ore Body, Mount Isa, QueenslandBy Edwards A. B
A suite of specimens from the newly developed Black Star copper ore body at Mount Isa was made available for mineragraphic study by the Mount Isa Mines, Ltd. The specimens were selected as representat
Jan 1, 1945
-
Oxyfinestm Technology For The Re-Melting Of Fines, Dust And SludgeBy J. von Schéele
OXYFINESTM is an oxyfuel-based concept for in-plant recycling. It enables the possibility of fines, dust, sludge (without any drying step) and other by-products generated by the stee
Jan 1, 2004
-
Pulverizing GoalsBrief descriptions of several types of unit pulverizeI' are given and the functioning of the components that crush, carry, dry and classify the coal is considered. A distinction is drawn between
Jan 1, 1957
-
Detroit Salt Mine – Past and FutureBy E. Z. Manos
The Detroit salt mine is operated by the Detroit Salt Co. It is one of the oldest underground room-and-pillar mines in the United States still in production. Mining at the Detroit salt mine began
Jan 1, 2003
-
Mesothermal Gold Mineralisation in the Tectonically Active Southern Alps: Analogues for the Otago Schist?By P O. Koons, R J. Norris, S C. Cox
The Southern Alps is an active oblique collisional zone which has a characteristic wedge-shaped geometry above a low-angle ductile shear zone. The Main Divide region is a relatively low strain z
Jan 1, 1997
-
Mine Seismicity and The Comprehensive Nuclear-Test-Ban TreatyMany mining operations generate seismic signals. They come from blasting and from underground mine failures such as rockbursts, longwall first caves, coal bumps and pillar collapses. Traditionally,
Jan 1, 2000
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
The Dissolution of Gold in Cyanide Solutions-An Electrochemical StudyBy Koch D. F A
An electrochemical study of the dissolution of gold in aerated cyanide solution shows that the dissolution rate is determined by the nature of the surface. A passive film (probably a basic cyanide) fo
Jan 1, 1964
-
The Hydraulic Transportation of SandsFactors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical
Jan 1, 1959
-
Copper Matte Granulation At The Kennecottutah Copper SmelterBy David B. George
Kennecott Utah Copper adopted Outokumpu Flash Smelting and Kennecott-Outokumpu Flash Converting in 1995, a process based on granulating high grade copper matte. While nickel mattes and very small qu
Jan 1, 2006
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985