Search Documents

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001

  • AUSIMM
    Increasing Face Ventilation in Coal Mines

    The author summarizes and extends the relevant results of papers previously published by various authors and presents these results in chart form. The charts are used to demonstrate the theory on a hy

    Jan 1, 1958

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • AUSIMM
    Electrowinning of Lead Directly From Galena

    A description is given of preliminary work done to identify the problems inherent in electrochemical oxidation of metal sulphides, and particularly in the use of powder compacts as anodes in electroly

    Jan 1, 1972

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • TMS
    Influence of TCP Phase on Enduring Property of Single Crystal Nickle-Based Superalloys

    By Tian Sugui

    By means of the measurement of the enduring property and microstructure observation, an investigation has been made into the influences of the element Re and TCP phase on the enduring property of the

    Jan 1, 2010

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • AUSIMM
    Magnetite Recovery Using a Wet Drum Separator

    By Lyman G. J

    Magnetic separator operation in the recovery of magnetite in heavy medium circuits was studied by conducting a series of tests on a full size wet drum magnetic separator.The significant operational va

    Jan 1, 1983

  • ISEE
    Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee

    By Unknown

    Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals

    Jan 1, 2003

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • AUSIMM
    Calculation of Metal, Coke and Gas Temperature Distributions in the Cupola Furnace

    Calculations of the temperatures of metal, coke, and gas at any level in the cupola furn~ce can be carried out by means of heat balances, using data obtained from experiments with an 18 in. experiment

    Jan 1, 1963

  • AIME
    Reservoir Engineering - General - Effect of Composition and Temperature on Phase Behavior and Dep...

    By T. K. Perkins, L. R. Kern, R. E. Wyant

    Many factors influence the results of hydraulic fracturing to stimulate well productivity. Most of these factors have been studied and their effects discussed in the literature. However, the movement

  • AUSIMM
    Some Aspects of Suction Dredge Design

    Important factors in dredge design are the estimation of total head, and the determination of flow in and around suction nozzles and in pipe lines. Total head for the dredge pump is calculated from ve

    Jan 1, 1962

  • CIM
    Drum Hoisting in North America ? Approach to Design

    By Mike Robotham

    When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right

    May 1, 2011

  • ISEE
    Proposed Draft of the ISEE Seismograph Performance Specifications and General Guidelines for Seismograph Field Use (23551c26-fab0-471e-a564-2605bfe7a483)

    By Richard R. Brochu

    At the International Society ofExplosives Engineers Annual Conference held in Nashville, Tennessee in February 1995, a Seismograph Standards Committee was established. The purpose of this wmmittee was

    Jan 1, 1998

  • AUSIMM
    Application of Reverse Flotation in Upgrading Western Australian Magnetite Iron Ores

    By Misra V. N

    Upgrading of a Koolanooka magnetite iron ore sample provided by Kingstream Steel Ltd was investigated using low intensity magnetic separation (LIMS) and reverse flotation. The ore contained 38.6 per

    Jan 1, 1999

  • SME
    Operators Use First-Out Fault Detection To Dramatically Reduce Equipment Downtime

    By R. Schulz, K. King

    Concentrating Line 6 just went down again. The control room operator checks the graphic display. Only one piece of equipment shows an alarm. Clicking on the ball mill icon, he discovers the culprit wa

    Jan 1, 2001

  • DFI
    List Of Delegates

    AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,

    Jan 1, 1994

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989