Search Documents

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • SAIMM
    Application Of Nanofiltration In Metal Recovery

    By I. W. van der Merwe

    Recently, a new kind of filtration has emerged, namely nano-filtration (NF). It is a membrane-based process which exhibits totally unique separation characteristics for dissolved salts as well as for

    Jan 1, 1998

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • TMS
    Novel Technology for Treatment of Acidic Wastewater Containing Mercury in Zinc Smelter by Biologics

    By Qingwei Wang

    This study focused on acidic wastewater from producing sulfuric acid system in zinc smelter containing mercury 21.48mg/L, zinc 55.85mg/L, lead 38.50mg/L, copper 1.68mg/L, cadmium 10.25mg/L, As 29.86mg

    Jan 1, 2009

  • AUSIMM
    Magnesia from magnesite by calcination/carbonic acid leaching: Effect of magnesite/dolomite ratio

    By Moorrees C, Koh P. T, Tsambourakis G

    Calcination of samples from the Savage River region of Thsmania containing varying magnesite/dolomite ratios under conditions optimized for the magnesite component, followed by carbonic acid leaching

    Jan 1, 1987

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • SME
    Operation of large underground fans at Kidd Mine ? progressing through the challenges

    Kidd Mine in Northern Ontario is now producing from Stage 1 of the Mine D expansion project ? mining between 2100 m and 2700 m below surface. Planning for Stage 2 of the Mine D project is already well

    Jan 1, 2009

  • DFI
    New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of Development

    By J. Nakayama

    For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological

    Jan 1, 1988

  • SAIMM
    The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia Mine

    By J. Krzyzanowska

    Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current

    Jan 1, 2007

  • AUSIMM
    æCleanfillingÆ ù A Valuable Means of Rehabilitating Quarries in Auckland

    By A Hanna

    Quarries around Auckland have reached or are reaching the ends of their lives, which raises issues about rehabilitation. Significant volumes of 'cleanfill' are generated by the City, particu

    Jan 1, 2002

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • IIMP
    Evolución del sistema de control y supervisión operación L-SX-EW Toquepala

    By Jorge Oviedo

    La planta de lixiviación, extracción por solventes y electrodeposición (L-SX-EW) de Southern Perú es una operación hidrometalúrgica dedicada a la lixiviación ácido – bacteriana de los botaderos de min

    Aug 25, 2002

  • SAIMM
    An Investigation Into The Physical Constraints Of The Current Sub-Decline At Turffontein Shaft

    By M. C. Bhulose

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The purpose of this project was to identify constraints that could occur in the current sub-d

    Jan 1, 2004

  • AUSIMM
    Taharoa Minesite Plant Relocation

    By P Rowe

    New Zealand Steel's Taharoa titano-magnetite mine, south of Auckland, set two national load records when it transported around 2000 t of mining equipment three kilometres overland on time, under

    Jan 1, 2001

  • DFI
    Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 Introduction

    By Andy Schroeder

    Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun

    Jan 1, 1997

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • AUSIMM
    The Copper-Clay Deposits at Mount Lyell, Tasmania

    The copper-clay deposits consist largely of goethite and clayey mudstones carrying native copper, cuprite, and chalcocite. The mudstones are of Ordovician age, are interbedded with Fe-Mn carbonates, a

    Jan 1, 1969

  • AUSIMM
    Mining a 100 Million Tonne Orebody Without Subsidence

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There were

    Jan 1, 1980

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987