Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Implementation of Rock Mechanics Into a Multiple Level Limestone Mine

    By David A. Newman

    In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine

    Jan 1, 2014

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Considerations Of Gas Outbursts In Using Dome Salt Mines For Storage Of Oil And Nuclear Waste

    By M. Ashraf Mahtab

    A feature of interest in stability of excavations in domal salt is the phenomenon of gas outbursts which has occurred in five of the six mines in Louisiana salt domes. Gas outbursts are sudden errupti

    Jan 1, 1981

  • SME-ICGCM
    Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian Conditions

    By Mark Colwell

    This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was

    Jan 1, 1999

  • SME-ICGCM
    Analysis of Alternatives for Using Cable Bolts as Primary Support at Two Low–seam Coal Mines

    By Gabriel S. Esterhuizen

    "Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions. This paper describes cable bolting solutions at two low-seam coal mines in similar ground cond

    Jan 1, 2015

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry Roof

    By Wenjun Ju

    It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring

    Jan 1, 2001

  • SME-ICGCM
    Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal Mine

    By Y. P. Chugh

    About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for

    Jan 1, 2004

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    A Practical and Efficient Steel King Beam Structure Design Methodology at Slope Bottom Intersections

    By Stankusm John C., Xiaoting Li

    "Quantitatively identifying the load on a steel king beam set is a complicated issue in designing the king beam structure at the slope bottom area. From an engineering perspective, understanding the n

    Jan 1, 2018

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal Seams

    By Zhaohui Wang, Jiachen Wang

    "Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h

    Jan 1, 2018

  • SME-ICGCM
    Geotechnical Strata Characterisation Using Geophysical Borehole Logs

    By Terry Medhurst

    Geophysical logging is routinely undertaken as part of most Australian coal mining exploration programs. Typically, the main application is the determination of coal seam depth and the qualitative est

    Jan 1, 2005

  • SME-ICGCM
    Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface Feature

    By Bruce K. Hebblewhite

    BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini

    Jan 1, 2014

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    The Integration Of Geology And Engineering In Ground Control And Mine Planning For A Multi-Level Underground Limestone Quarry

    By D. Newman

    An underground limestone quarry, developed in the 1940's, transitioned from a surface quarry to an underground room-and-pillar operation. The quarry expanded to a second underground level when th

    Jan 1, 2001

  • SME-ICGCM
    Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash Mine

    By Alexandra Garcia

    A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th

    Jan 1, 2014

  • SME-ICGCM
    Advances in Remote Sensing Techniques for Monitoring Rock Falls and Slope Failures (17th CONFERENCE ON GROUND CONTROL IN MINING)

    By J. M. Girard

    Ground control problems at surface mining operations can occur for a variety of reasons. Stress, gravity loading, rock strength, geology, pore pressure, weather effects, underground workings, and many

    Jan 1, 1998

  • SME-ICGCM
    Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected Examples

    By Axel Preusse

    To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem

    Jan 1, 2000