Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    Performance of Various Standing and Cribless Tailgate Support Configurations in a Large Eastern Coal Mine

    By Gregory M. Molinda

    Difficult mining conditions in deep western U.S. Iongwalls have necessitated the use of novel tailgate support systems. Extreme ground movement in these yielding gate systems has caused operators to u

    Jan 1, 1997

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Assessment of the Rockburst Proneness in Hard Rock Coal Mines

    By S. P. Singh

    Rockburst is a sudden manifestation of the release of elastic strain energy stored in the rock. Therefore the tendency of the rock to burst should depend upon its ability to accumulate elastic strain

    Jan 1, 1986

  • SME-ICGCM
    Pressure Measurements in the Gob (27227c3c-951c-4108-ba5c-3b6e67d232fb)

    By H. Maleki

    Gob pressure measurements were made in a Western U. S. coal mine as part of a long-term program to evaluate cave progress and to determine the influence of geological discontinuities on caving conditi

    Jan 1, 1984

  • SME-ICGCM
    Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems

    By Reha Ozel

    The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three

    Jan 1, 1990

  • SME-ICGCM
    Evaluation Of Mobile Roof Support Technologies

    By Hamid Maleki

    This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l

    Jan 1, 2001

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability

    By Hamid Maleki

    During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses

    Jan 1, 2000

  • SME-ICGCM
    Identification Of Critical Slope Failure Surfaces With Critical Tension Cracks

    The formation of tension cracks in slopes is well known. Analytical studies require the determination of a critical slip surface for any slope and, in doing so, it is necessary to consider an appropri

    Jan 1, 1989

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Ground Control Technology for Mass Exploitation of Coal Deposits with Continuous Miner: A Review of the Indian Scenario

    By Sanjay Kumar Singh

    This paper presents ground control technology associated with a continuous mining operation for mass exploitation of underground coal deposits in the Indian coal mining Industry It shows that competen

    Jan 1, 2011

  • SME-ICGCM
    Effects Of Surface Topography On The Stability Of Coal Mine Openings

    By Gregory M. Molinda

    An investigation was conducted to determine the nature and frequency of coal mine roof failure beneath valleys. A mechanism for this failure, and suggestions for controlling this problem are presented

    Jan 1, 1990

  • SME-ICGCM
    Early Warning of Longwall Weighting Events and Roof Cavities Using Lva Software

    By David I. Hoyer

    It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours

    Jan 1, 2011

  • SME-ICGCM
    Methods To Determine Pillar Stress Distribution And Its Effect On Stability

    By David P. Conover

    The effects of stress distribution on pillar stability were evaluated through rock mechanics studies conducted in three underground room-and-pillar coal mines. Results of the three field instrumentati

    Jan 1, 1989

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed

    By George Mishra

    In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco

    Jan 1, 1981