Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effects of sintered metal diesel particulate filter system on diesel aerosols and nitric oxides in mine airThis study was conducted to establish the effects of a diesel particulate filter (DPF) system with sintered metal substrate on the concentrations and size distributions of nano and ultrafine aerosols
Jan 1, 2009
-
Using lean six sigma techniques for projects at a Canadian uranium mine, millBy S. G. Britton
"Strategies to improve performance in mining production, maintenance and mineral processing operations have evolved over time from straightforward time studies of individual machine performance in the
Nov 1, 2016
-
Pilot Plant Demonstration Of The Platsol Process For The Treatment Of The NorthMet Copper-Nickel-PGM DepositPolyMet Mining is developing the NorthMet property near Duluth, MN. Laboratory investigations have led to the development of the Platsol process to dissolve in one step the base metals (copper and nic
Jan 1, 2003
-
Nitrogen Inertization At San Juan Coal Company’s Longwall OperationBy Jacques F. Abrahamse, Kevin A. Bahe, T. Arthur Palm, Gregory E. McCluskey, Stephen L. Bessinger
Introduction Basis For System San Juan Coal Company (SJCC) is a subsidiary of BHP Billiton. Until recently, BHP Billiton operated three surface mines in northwestern New Mexico: Navajo, San Juan,
Jan 1, 2005
-
Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone TechnologyBy R. Bokotko, J. D. Miller, J. Hupka
Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption
Jan 1, 2002
-
Brightwater Conveyance System Will Expand Seattle?s Wastewater TreatmentBy John E. Newby
Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide
Jan 1, 2007
-
Shaft Sinking In Difficult Ground Conditions For The LEP Project, Geneva, SwitzerlandBy F. Dieu, C. Laughton
CERN, the European Laboratory for Particle Physics, is, at present, constructing an underground tunnel and cavern network to house a Large Electron Positron (LEP) colliding beam machine. This paper
Jan 1, 1987
-
Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine LandsBy B. Samoski
In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands
Jan 1, 2002
-
Latitudinal/land-mass proximity controls on ferromanganese crust composition and resource potential, Ninetyeast Ridge, Indian OceanBy Kira Mizell, James R. Hein, Tracy Conrad
"The Ninetyeast Ridge (NER) extends roughly N-S as a topographic feature for 5000 km, from 31° south to 10° north (Fig. 1) where it becomes buried beneath the Bengal Fan at its northern end. These two
Sep 1, 2014
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
Rock Fall Control In Surface Mining With Cable & Ring Net FencesBy C. O. Brawner, J. Kalejta II
The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen
Jan 1, 2002
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Head Grade Effects on Gold RecoveryThe occlusion of unliberated gold particles in silicates and sulfides in crushed/milled ore dictates the recovery that can be expected. The grade of this occluded gold in cyanide leach residues shows
Jan 1, 2008
-
Development of Cyanide Leaching Processs For Small High Grade Gold and Silver DepositsBy Michael Harris, David Mosch
The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing
Jan 1, 1987
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case HistoryBy Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Clay Mineralogy Of The Goathill North Rock Pile, Questa Mine, Taos County, NM: Origins And Indications Of In-Situ Weathering - Preprint 09-098By K. Donahue
Clay minerals play an important role in the gravitational stability of man-made rock piles by affecting geotechnical and hydrological characteristics of the material. The Goathill North rock pile at t
Jan 1, 2009
-
Nuclear Power ? SME StatementNuclear power currently produces about 20% of the electricity in the US, with 104 nuclear power plants located in 31 states. The commercial US nuclear industry contributes over $4 billion annually to
Jan 1, 2011
-
The Use of Polymer Concrete in Sewage Tunnels for One-Pass Segmental LiningsBy Christian Maguire
The presence of hydrogen sulphide in sewerage systems leads to severe concrete corrosion. Acid causes breakdown of the concrete matrix, and attacks reinforcement. Older sewer systems under acid attack
Jan 1, 2008
-
Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - IntroductionBy M. Botz
Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the
Jan 1, 2011
-
Cemented Rock Fill System Design And Application In Leeville Underground MineBy C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500
Jan 1, 2011