Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to ConstructionBy Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo
INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f
Jan 1, 2007
-
An American Down Under Living And Working In Australia - IntroductionBy J. G. Pippenger
The mining industry has been Australia?s major economic driver over the past decade, contributing 8% to Australia?s Gross Domestic Product and 26% of Australian Stock Exchange Market capitalisation.
Jan 1, 2011
-
Determination Of The Leaching Parameters For A Refractory Gold Ore Containing Aurostibite And Antimony Minerals: Part II ? AD ZoneBy G. Deschênes
Following a successful investigation on the Central Zone sample, a cyanidation study was conducted on an ore sample from the AD-MW Zone of Clarence Stream Property, owned by Freewest Resources Canada,
Jan 1, 2009
-
A simplified approach to coal mine seal designBy M. M. Gadde
Recent regulatory changes in the United States make it mandatory to conduct structural analysis of coal mine seals used to isolate abandoned workings from active mining areas. Different loading criter
Jan 1, 2009
-
"SAFETY FIRST" in the development of underground mining machinesBy E. Lammer
"Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio
Jan 1, 2011
-
Ground Water and Ground-Water ControlBy R. L. Loofbourow
R. L. LOOFBOUROW 26.1-WATER FLOW, USE, EFFECTS, CONTROL Sec. 4 discusses ground water as a mineral resource. This section deals wits its control. 26.1.1-IMPORTANCE Flows of water have an im
Jan 1, 1973
-
Strategies for ensuring a sustainable supply of quality mining professionals for the worldThe mining industry continues to experience a skills shortage and this is having an impact on the ability of mining companies to operate sustainably. Apart from a few exceptions, there is a dearth of
Jan 1, 2011
-
Energy Fuels Prepared To Ride Uranium?s ResurgenceThe two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en
Jan 1, 2008
-
The Ignition of Methane and Coal Dust by Air Compression – The Experimental Proof – Preprint 97-44By W. Lin, M. J. McPherson
When a large area of open gob collapses suddenly, a windblast is produced that can cause considerable damage throughout the infrastructure of a mine. In a few cases, the windblast has been accompanied
Feb 24, 1997
-
Fitness-For-Purpose: Should You Buy One Grinding Mill For The Price Of Two?By P. Ulrich, V. Svalbonas
The early to mid 1980s was a period of mining consolidation, and many senior design engineers retired from the mill industry. Similar conditions have existed in the last few years. This creates a lo
Jan 1, 2001
-
Ventilation on demand (VOD) project ? Vale Inco Ltd. Coleman MineBy C. Allen
Vale Inco Ltd. is trialing several energy conservation initiatives in an effort to minimize costs and reduce green house gas emissions. The Ventilation on Demand (VOD) concept is a major project being
Jan 1, 2009
-
Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case StudyBy Kevin Andrews, Terry Hamric, Scott Nelson
"Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini
Jan 1, 2019
-
Health Effects Of Amosite Mining And Milling In South AfricaBy Jill Murray
This study focuses on the amosite mining region in South Africa and associated health effects, compared to other mined asbestos fiber types. Historically, dust and fiber levels were high in the amosit
Jan 1, 2007
-
Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere
Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho
Jun 13, 2023
-
Assessment Of Stable And Failed Pillars In Underground Limestone MinesPillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na
Jan 1, 2008
-
Performance Of The Lorraine Mine Site Cover To Limit Oxygen MigrationBy Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr
A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover
Jan 1, 2005
-
Mine Power SystemsBy Christopher J. Bise
INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper
Jan 1, 1986
-
Reliability of the Non‑linear Modeling in Predicting the Size Distribution of the Grinding Products Under Different Operating Conditions - Mining, Metallurgy & Exploration (2023)By Konstantinos Komnitsas, Evangelos Petrakis, Emmanouil Varouchakis
During the modeling of grinding systems, population balance modeling (PBM) which considers a constant breakage rate has been widely used over the past years. However, in some cases, PBM exhibited some
Jun 24, 2023
-
Cat Tests 360-st 797 Truck, Upgrades Wheel LoadersCaterpillar’s 797 327-t (360-st) mining truck is currently being tested at the company’s proving facilities. Mine evaluations began in the second quarter. The unit will be commerically available in
Jan 1, 1999
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005