Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Gemini-Scout Mine Rescue Robot

    By J. Garretson

    When mining accidents occur, workers often become trapped and/or incapacitated. Current rescue operations can be dangerous and too slow to produce favorable outcomes. Currently, no method exists for

    Jan 1, 2012

  • SME
    The Impact Of Surface Features Above Underground Mines On Emergency Response - Preprint 09-066

    By N. T. Lowe

    The National Institute for Occupational Safety and Health (NIOSH), Spokane Research Laboratory (SRL), investigated a means to evaluate the potential impact of surface conditions above underground mine

    Jan 1, 2009

  • SME
    Occupational Ergonomics: Ergonomic Issues In The Mining Industry

    By E. A. Metz

    Ergonomics is the art and science that tries to understand the complex interrelationships among employees, their work environment, equipment, work methods and job demands. Coal and metal/nonmeta

    Jan 1, 2002

  • SME
    CSM-USBM Rotary Cutting Machine: Research Capabilities And Trials For Improving The Performance Of Tunnel, Shaft And Raise Boring Machines

    By Levent Ozdemir, Robert J. Evans, Russell J. Miller, William Sharp

    This paper describes the specifications and capabilities of a 6 ft (1.83 m) diameter laboratory rotary cutting machine which was designed and fabricated under a Bureau of Mines (USBM) contract awarded

    Jan 1, 1983

  • SME
    Reducing Mining Costs Through Computer Technology

    By Michael E. Stickney

    "Soft technology" computers and computer programs-brings to mind a room full of machines, tape drives, disks, plotters, and printers spitting out financial reports. Computers now have a much broader s

    Jan 4, 1981

  • SME
    Multistep thermodynamic calculation for copper-dross bath smelting process

    By Tianzu Yang, Weifeng Liu, Lin Chen, BOYI XIE, DUCHAO ZHANG, HUI XIAO

    In this study, the oxygen-rich bath smelting process of copper dross was simulated using Factsage software. It was found that the two-step simulation results agreed better with the industrial data, es

  • SME
    Alberta Lake Re-Established After Draining to Mine Coal

    By Sukru Sumer

    East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west

    Jan 1, 1995

  • SME
    Recent Developments In High-Pressure Water-Jet Assisted Cutting Of Rock And Coal

    By George K. Schenck

    INTRODUCTION Recent advances in high-pressure water jet technology can be effectively employed in mining and tunneling. The new equipment is based on available industrial hardware such as pumps, no

    Jan 1, 1983

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • SME
    Alternative Contracting Methods

    By John Reilly

    Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),

    Jan 1, 2007

  • SME
    Mining Matters At National Western Mining Conference

    With unprecedented worldwide growth and increasing global demand for energy expected to swell by 60 per-cent in the next two decades, mining matters as much now, if not more, than it ever has. This w

    Jan 1, 2008

  • SME
    A Review Of Tunneling Difficulties In Carbonate Sedimentary Rocks

    By D. P. Richards

    Tunneling in carbonate sedimentary rocks such as lime stones and dolomites can be difficult when solution channels or voids are anticipated. Addressing the risk aspects associated with these formation

  • SME
    Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History

    By Tom Szaraz

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla

  • SME
    Inherently Safe Mining Systems

    By Donald G. Rogich

    The concept of initiating a large action-oriented contract, directed toward inherently safe mining systems, was conceived by the U. S. Bureau of Mines in January 1970. At that time we were in the proc

    Jan 1, 1972

  • SME
    Develop Specifications Before Selecting Heavy-Duty Apron Feeders

    By Shular R. Scudamore

    There was a time when heavy-duty apron feeders were built to last almost forever. The machines were heavy and built to maintain certain expected longevity and reliability. Increasing emphasis on retu

    Jan 12, 1983

  • SME
    Tonnage Factor – A Matter of Some Gravity

    By I. S. Parrish

    One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most

    Jan 1, 1993

  • SME
    Influence of Coal Pillars on the Stress and Permeability of Mining‑Disturbed Coal Seams for CBM Drainage

    By Kai Wang, Chao Xu, Qiang Fu, Tong Yang, Chunyu Zhao, Wei Zhao

    The stress of a coal seam is an important factor that affects the permeability of the coal seam and then affects the coalbed methane (CBM) drainage. In China, adjacent coal seam mining is an important

    Nov 19, 2022

  • SME
    The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project

    By Jean Habimana

    Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc

  • SME
    Case Histories of Rehabilitation of French Railway Tunnels

    By Verya Nasri

    This paper presents analysis of damages and rehabilitation design for three major French rail-way tunnels built in mid-19th century. The La Nerthe tunnel underwent ovalization deformation with excessi

    Jan 1, 2008

  • SME
    Portland, Oregon’s Alternative Contract Approach—A Final Summary

    By Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald

    Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20

    Jan 1, 2007