Recovery Of Economic Values From Backfill Prior To Placement.By C. J. Van Niekerk
When gold plant residues are cycloned for producing a coarse product for backfilling the gold and uranium values are upgraded in the backfill product. Gravity concentration, wet high intensity magneti
Jan 1, 1988
-
Control Of Scale Deposit Problems In Slurry PipelinesBy Y. G. Che, M. Brown, R. L. Gandhi, M. D. Watson
Slurry pipelines have proven to be an economical method of mineral concentrate transport over long distances. Some of these pipelines are internally lined with high-density polyethylene (HDPE) to avoi
Jan 1, 2007
-
Three-dimensional Stress Analysis of Block Caving Mining LayoutsThe block caving mining method is used to mine large orebodies in weak rock types. The layout for block caving requires that a considerable amount of development is carried out on the extraction drive
Jan 1, 1987
-
Application of Computers to the Teaching of Mining EngineeringBy L. Wade
The advent of relatively cheap computing power has precipitated a rapid growth of computer usage in the mining industry. In order to obtain most benefit from this development a need is recognised for
Jan 1, 1987
-
The effect of cost and price fluctuations on the optimum choice of mine cutoff gradesBy J. A. L. Napier
An analytical solution to the best choice of cutoff grade for a mine is deduced for an assumed model of selective mining. It is found that this choice is determined by the constancy of a special funct
Jan 1, 1983
-
Practical Applications of a Computer Orebody Modelling System on the Broken Hill Mine, Black Mountain, AggeneysBy D. J. Mourant
Day-to-day operations on the Broken Hill mine of the Black Mountain Mineral Development (BMMD) Company require a detailed knowledge of the distribution of the ore minerals within the orebody. The da
Jan 1, 1987
-
Reinforced Cemented Tailings FillBy L. Dison
There are many potential uses in gold mining for an initially stiff element of backfill that will yield at a predetermined load and maintain that load to beyond a compression of 30%. Such elements cou
Jan 1, 1988
-
Sustainability Of Innovative Management Practices Of Geotechnical Risk At Damang Pit Cut Back (Dpcb) ? A Case Study At Gold Fields Ghana, Damang MineBy E. Dadzie
This paper will review some methods used to manage geotechnical risk at Damang Pit Cutback. The pit depth is designed up to 250m with push back on the eastern and western walls of the existed and depl
Jan 1, 2008
-
Factors limiting autonomy of chemical oxygen self-rescuersBy J. B. A. Solar Menéndez, M. A. Martínez Fidalgo, L. A. Alvarez-Santullano
1. ANTECEDENTS This present communication refers to the results of the research project entitled "Training in the correct use of chemical oxygen self rescue apparatus and also an analysis of apparatu
Jan 1, 2003
-
The pre-concentration of gold using a Reflux Classifier, M. le Roux, J.H. van Vreden, Q.P. Campbell, and M. NdabeniBy M. Ndabeni, J. H. van Vreden, M. Le Roux, Q. P. Campbell
It is not uncommon for gold slurry ponds or screen oversize dumps to contain several different types of carbon-rich contaminants. These contaminants act as robbers of dissolved gold which has a detrim
Jan 1, 2020
-
The Pumping Characteristics And Rheology Of Paste FillsBy C. G. Verkerk
The paper discusses the transport and rheological characteristics of high concentration slurries or pastes for backfill purposes. The influence of pipe size, particle size distribution, additives, coa
Jan 1, 1988
-
The Application of Log Semi-variograms to the Kriging of Moderately Skew Raw DataBy M. Thurston
This case study shows that for a set of lognormal data with a low coefficient of variation the semi-variogram of the logs has almost the same shape as the semi-variogram of the raw data. This means th
Jan 1, 1987
-
Recovery of unburned carbon by conventional flotation of bottom ashes from Tuncbilek Thermal Power Plant - SynopsisBy A. Yamik
This research study includes studies carried out on the recovery of unburned carbon in the ashes of Tuncbilek Thermal Power Plant. Bottom ashes have been identified by X-ray diffraction and X-ray fluo
Jan 1, 2008
-
Tunnelling in heterogeneous ground—stresses and displacementsBy K. Grossauer, W. Schubert
For tunnelling in poor and heterogeneous ground a reliable on-site short-term prediction is required to allow a safe and economical construction. With the use of absolute displacement monitoring data
Jan 1, 2003
-
Comparison between bond crushing energy and fracture energy of rocks in a jaw crusher using numerical simulationBy A. Refahi
For predicting the energy consumption during the size-reduction process, the Bond approach is often used. In this work, the PFC3D discrete element method (DEM) software was employed to model the crush
Jan 1, 2009
-
A brief review of corrosion-fatigue phenomena in simulated pressurized waterreactor environmentsBy J. H. Bulloch
A short review is given of the effects of corrosion fatigue on the materials used in pressurized water-reactor vessels. Selected topics such as testing procedures, test data, and mechanisms in simulat
Jan 1, 1987
-
Mine-wide panel stability monitoring at Anglo Platinum Union JV - SynopsisBy D. F. Malan
This paper describes the development and implementation of amine-wide continuous stability monitoring system at the Declines Section, Anglo Platinum Union JV. The Declines Section at Union JV experien
Jan 1, 2010
-
Quantitative Evaluation Of Fill Performance In South African Gold MinesBy N. C. Gay
The quantitative evaluation of the performance of fill materials placed in gold mine stopes is achieved by (i) measurement of the in-situ load- displacement, or stress-strain, characteristics of the m
Jan 1, 1988
-
Prediction Of Slope Failure At Letlhakane Mine With The Geomos Slope Monitoring SystemBy George Kayesa
[ ] A multiple-bench slope failure occurred at Letlhakane mine on 14th July 2005. No injuries or damage to equipment was suffered and mining production was not affected. Slope failure was precede
Jan 1, 2006
-
A review of the physical properties of base metal mattes - SynopsisBy A. W. Sundström
This paper reviews the development and suitability of various important thermophysical and electrical properties with respect to base metal mattes. Areas of focus include the critical validation of me
Jan 1, 2008