Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flotation technologies for the enrichment of complex berillium ores, A.V. Kurkov, S.I. Anufrieva, and A.A. RogozhinBy A. A. Rogozhin, S. I. Anufrieva, A. V. Kurkov
The results of development of technologies for flotation concentration of two types of complex beryllium ores are presented: beryllium-fluorite in apocarbonate metasomatites (Type I) and rare-earthber
Jan 1, 2020
-
An Exploration Model for Tabular OrebodiesBy Richard F. Link, Jr. Koch
"A mathematical simulation model has been devised to guide the layout of surface or underground mine workings, drill stations, and drill holes that are established in order to search for tabular ore b
Jan 1, 2014
-
Application of a novel agglomeration process in recovering chalcopyrite, G. Sahasrabudhe, G. DeIuliis, and K.P. GalvinBy G. Sahasrabudh, G. DeIulii, K. P. Galvin
A novel agglomeration process has been developed, utilising a concentrated water in oil emulsion as a binder. The binder is typically 95 wt% water, the remainder being an organic phase containing kero
Jan 1, 2020
-
Effect of Crushing on Near-Gravity Material Distribution in Different Size Fractions of an Indian Non-Coking CoalBy S. Mohanta, I. D. Behera, B. Sahoo
"Run-of-mine coal contains particles of different sizes with different specific gravities, and when this coal is crushed, the amount of material present in a particular density class changes. This alt
Jan 1, 2016
-
Evaluation of Applicability of High Ketoxime Extractant Blends for Copper Solvent Extraction Plants of the Democratic Republic of CongoBy G. Chisakuta, P. Bwando, G. Mitshabu
By the end of 2022, the south-eastern Copper Belt region of the Democratic Republic of Congo was host to more than 40 small, medium, and relatively large sized copper solvent extraction sites. To date
Jan 1, 2023
-
Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!)By G. Popplewel
Commencing with the Pre-Feasibility Study (PFS) conclusions, the Orapa 3 process design evolved through a phase of value-engineering studies. An overall re-evaluation of the originally proposed proces
Jan 1, 2010
-
Quantified Value-created Process (QVP) – A value-based process for mine design and operating decisionsBy J. Hadjigeorgiou, T. R. Stacey
This paper introduces the Quantified Value-created Process (QVP), a decision-making process for use in mine design and operation. The implementation of the QVP is founded on a ten-step rock engineerin
Feb 2, 2022
-
Recommissioning A Two-Km Long Waste Mica Slurry PipelineBy P. Harris, N. Heywood
An existing 1 800 m long pipeline, which carried waste mica slurry from kaolin processing, is to be recommissioned. The mica solids throughput is to be substantially increased from 5.2 t/h up to a max
Jan 1, 2007
-
In-Pit Crusher Location as a Dynamic Location ProblemBy M. Paricheh, M. Rahmanpour
"The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive
Jan 1, 2017
-
Roll-to-roll coating methods for the manufacture of polymer electrolyte membrane fuel cell membrane electrode assembliesBy O. Barron, C. Felix
In 2023, polymer electrolyte membrane fuel cell membrane electrode assemblies accounted for about 62% of the global fuel cell market share and this demand is expected to grow. Commercialisation requir
May 27, 2025
-
Appointment of women to mining boards – Evidence of tokenismBy N. V. Moraka
Mining companies are required by law to improve representation of women on their boards. However, progress in this regard has been slow. Boards of directors play an important role in formulating corpo
Dec 13, 2023
-
Compaction Tests on Coking Coals. Part 2: Pilot-Plant-Scale Compaction with a 60-ton Hydraulic PressBy G. Coetzer
"Prior to operating a non-recovery coke pilot plant oven, it was essential to ascertain coal cake stability during the loading of a 1 m3 (1 m × 1 m × 1 m) coal cake into the cold pilot-plant oven by a
Apr 1, 2019
-
The interactions of butyl thiol collectors with sperrylite (PtAs₂) at different pulp chemistries, S. Pikinini, B. McFadzean, and C.T. O’ ConnorBy B. McFadzean, S. Pikinini, C. T. O’ Connor
Sperrylite (PtAs₂) comprises about 21% of the platinum group minerals (PGMs) in the Platreef ore and regularly reports to the tailings due to its poor floatability. Hence, improving its recovery will
Jan 1, 2020
-
The effect of operating conditions on stratification kinetics in a batch jig, L.C. Woollacott, A.K. Tripathy, and J.H. PotgieterBy L. C. Woollacott, A. K. Tripathy, J. H. Potgieter
This paper presents the second of a two part study on density stratification in a laboratory batch jig. The first study, reported elsewhere, investigated the effect of operating conditions on the stra
Jan 1, 2020
-
Characterisation of pyrite and arsenopyrite surface species in aqueous systems for selective flotation, P. Forson, S. Xu, R. Asamoah, M. Zanin, and W. SkinnerBy R. Asamoah, P. Forson, S. Xu, W. Skinner, M. Zanin
In most auriferous hydrothermal deposits, gold is preferentially associated with pyrite and arsenopyrite minerals, with higher economic gold values noted for the latter and arsenian pyrite minerals. I
Jan 1, 2020
-
Commercial opportunities for gold catalystsBy J. McPherson
In order to add value to South Africa?s gold reserves AuTEK, a joint venture between Mintek and Anglogold-Ashanti, was started in 2000 with the aim of developing new industrial uses for gold. Accordin
Jan 1, 2009
-
Comparison of normalized and nonnormalized block caving comminution modelsBy R. Castro, R. Gómez, F. Betancourt, M. Moncada
In block cave mining, rock fragmentation is a key parameter that influences the production level design and mine planning. Fragmentation occurs mainly by natural breakage during the caving process and
Nov 1, 2021
-
Los Bronces Development ProjectBy Nelson Sánchez
The Los Bronces Development Project (LBDP) was approved in October 2007 by the Anglo American plc Board at a capital cost of some US$1.74B, and is scheduled to be completed by the end of 2010. The pro
Jan 1, 2008
-
Behaviour of Cu, Fe, Ni and PGM in the atmospheric sulphuric acid leaching of Ni-Fe-Cu-S converter matte, M.I. Isaacs, P. Van Wyk, G. Akdogan, and S.M. BradshawBy G. Akdogan, S. M. Bradshaw, M. I. Isaacs, P. Van Wyk
In the mineral processing industry, Ni-Cu-Fe-S converter matte is leached in order to remove base metals from a concentrate containing platinum group metals (PGMs). This paper investigates the atmosph
Jan 1, 2020
-
In place leaching of oxidized gold deposits. A new method for recovering stranded gold resources?By P. A. Roberts
A modified in situ leaching method for extracting gold from oxidized gold ores using a non cyanide lixiviant is proposed. A non cyanide lixiviant is suggested because of the obvious concerns posed by
Jan 1, 2009