    Deep Mixing for Levee Repair at Hurricane Protection Project, P-17A, Louisiana, USA

    By Peter Cali, David Yang, Rakshya Shrestha, Ralph Griffin, Sushil Kafle, Motoji Watanabe

    "As a part of the ‘US Army Corps of Engineers - New Orleans to Venice, Louisiana Hurricane Protection Project’, deep mixing ground improvement was designed to reinforce the soft ground for the emergen

    Jan 1, 2015

  • DFI
    Repairs Of Diaphragm Walls, Lessons Learned

    By Raymond J. Poletto

    This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal

    Jan 1, 2011

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Laterally Loaded Caissons for Ontario College of Art & Design

    By William F. Starke

    "The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o

    Jan 1, 2004

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • DFI
    Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea Bissau

    By Frédéric Rocher-Lacoste

    On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da

    Jan 1, 2008

  • DFI
    Alternative Design Approach for Drag Load and Downdrag of Deep Foundations within the LRFD Framework

    By Timothy C. Siegel, Derrick Dasenbrock, Rich Lamb, Paul J. Axtell

    "The axial resistance provided by deep foundations may be divided into two components: side resistance and tip resistance. The direction that the side resistance acts depends on the relative movement

    Jan 1, 2015

  • DFI
    Foundation in Simsima Lime Stone for an Underground Reservoir

    By Chandramohan P. V., Ravi Kishore

    "An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d

    Jan 1, 2017

  • DFI
    Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC

    Jan 1, 2016

  • DFI
    Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun

    Jan 1, 2016

  • DFI
    Long Term Performance of Grouts and the Effects of Grout By-Products

    By Stephan A. Jefferis

    I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the

    Feb 10, 2003

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa

    Jan 1, 2017

  • DFI
    Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis

    By Uwe Hess

    For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th

    Jan 1, 1996

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    “Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation

    By Nagarajkumar BV

    Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu

    Nov 1, 2022

  • DFI
    Dynamic Pile Monitoring For Offshore Pile Acceptance

    By Scott Webster

    Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than

    Jan 1, 2010

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900