Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading

    By Nabil F. Ismael

    The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al

    Jan 1, 2008

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • DFI
    Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical Problems

    By Maurizio Siepi

    The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w

    Jan 1, 2002

  • DFI
  • DFI
    New Concepts For CFA (Auger Cast) Pile Controle - Synopsis

    By Shachar Magali

    This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique

    Jan 1, 2000

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    The Advantages Of Arbitration - I. Arbitration Defined

    By John B. Tieder

    Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir

    Jan 1, 1988

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet Piles

    By K. Viking

    The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser

    Jan 1, 2000

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000

  • DFI
    Roger Bullivant Cone Pile

    By R. A. Bullivant

    Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten

    Jan 1, 1992

  • DFI
    Preserving The Foundations Of Some Of Boston?s Oldest Buildings

    By Michael J. Atwood

    Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood

    Jan 1, 2011

  • DFI
    Keynote Lecture: Axial Design And Lateral Design - Deep Foundations

    By Mike Neill, O&apos

    ? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu

    Jan 1, 1998

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994