Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil ImprovementBy Fabrice Mathieu
The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi
Jan 1, 2006
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm WallBy D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
Critical Evaluation of Indian Standard for the Design of Laterally Loaded PilesBy Sanket Rawat, Ravi Kant Mittal, Vikash Prasad
"The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p
Jan 1, 2017
-
Hydraulic Impact Pile Hammers ? BackgroundBy Patrick Bermingham
The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes
Jan 1, 1987
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? SynopsisBy M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In SandBy Giuliana A. Zelada
This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature
Jan 1, 2000
-
Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep FoundationsBy Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi
This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim
Jan 1, 2018
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large DiameterBy Peng Jiahong
With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic
Jan 1, 1991
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Oakland Airport Roadway Project - SynopsisBy David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:By A. L. Garassino
Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside
Jan 1, 1994
-
Value Engineering – Design Risk and Reward at Major Sport Arena ProjectsBy Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018