Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Standards Based Approach to Mobile Equipment Data

    By Peter Cunningham

    General Description of Projects The objective is to streamline data transfer within our Process Control and Business Systems for the purposes of tracking actual production, reducing manual record kee

    May 1, 2013

  • CIM
    Energy Savings and Improved Recovery with Small Grinding Media

    By Michel Brissette

    "To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th

    Jan 1, 2009

  • CIM
    Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De Contrôle

    By Michel Aubertin

    Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè

    Nov 1, 2002

  • CIM
    Overview of the Great Whale Iron Ore Project( GWIOP )

    By Jean Rosaire

    ?GWIOP Location ?Climate and Physiography ?History ?Geology ?Deposit Types ?Mineralization ?Historical Mineral Resources ?Conclusions and Work Program

    May 1, 2007

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • CIM
    Atlas Copco drill rigs for mine automation and communication—A totally new technology platform for advanced mining systems

    By M. Ramström

    "In 2002, Atlas Copco Rock Drills AB released the new rig control system (RCS) technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on mo

    Jan 1, 2005

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • CIM
    X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die Casting

    By Zhuofei Yang, Jidong Kang, David S. Wilkinson

    The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The

    Jan 1, 2014

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill Control

    By Murray Wood, Michael Schaffer, Makat Katom

    "An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin

    Jan 1, 2003

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Role of dispersants in the production of fine particle size calcium carbonate and kaolin slurries (e12f2493-980b-4bb7-a3ca-e2b0966be8ac)

    By J. S. Phipps, D. R. Skuse

    "Aqueous slurries of fine particle size calcium carbonate are used in a diverse range of end-use products. In many cases, the end use performance is governed by the fineness of the particle size distr

    Jan 1, 2003

  • CIM
    Root-Cause Analysis of the Lacy Copper Phenomenon

    By R. Ramírez, N. Aslin, G. Ríos, T. Bravo, A. R. Almansa

    Lacy copper has been an on-going concern at Atlantic Copper for at least 10 years and was first reported to Glencore Technology in mid-2010. Over the past 12 years, many of the plates were replaced du

    Jan 1, 2019

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005