Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Role of Applied Biotechnology in Decommissioning Mining Operations

    By Margarete Kalin

    "Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma

    Jan 1, 1998

  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • CIM
    Mapping mining-induced subsidence from space in a hard rock mine: Example of SAR interferometry application at Kiruna mine

    By E. Henry, C. Mayer, H. Rott

    Hangingwall deformation monitoring at Kiruna mine is a major concern for Luossavaara- Kiirunavaara AB (LKAB) since underground production is deepening toward the town of Kiruna. In the quest for more

    Jan 1, 2004

  • CIM
    Material Balancing of Assays From on-Stream Analyzer

    By Claude Bazin

    "The On-Stream Analyzer has proven and is still proving to be an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilization

    Jan 1, 1995

  • CIM
    Climate Change: Risks and Opportunities for Mining and Exploration Companies

    By Barbara Hendrickson

    Outline ? Canadian Regulatory Update ? Turning the Corner: Background & Status ? Implications of U.S. Waxman-Markey bill for Canada ? Federal-provincial considerations ? Current certainties and

    May 1, 2009

  • CIM
    The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)

    By P. A. Witt

    "Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry

    Jan 1, 2005

  • CIM
    The Impact of Grinding Chemistry on Galena Flotation at Rosh Pinah Zinc Corporation, Namibia

    By Marco Lombard, Paulus Kapolo, Christopher J. Greet

    "The conversion of a concentrator from one grinding media type to another is a major undertaking in terms of both financial and technical risk. So, a strategy of completing sufficient laboratory and f

    Jan 1, 2013

  • CIM
    Oil-Field Waters of Alberta and Saskatchewan

    By W. P. Campbell

    Introduction OWING to the necessity of curtailing the length of this paper, nothing like an exhaustive treatment of the subject will be attempted. Instead, merely a few aspects will be considered,

    Jan 1, 1929

  • CIM
    Spontaneous Combustion - A Coal Mining Hazard

    By R. N. Chakravorty, K. K. Feng

    "There is growing evidence that modern methods of mining coal increase the risk of spontaneous combustion. Seemingly unimportant at this time, this hazard could prove to be a barrier to growth and dev

    Jan 1, 1973

  • CIM
    How to Expedite Geological Investigation and Prospecting in Canada

    ONE of the morning sessions at the recent Annual Meeting was devoted to a Symposium on ways and means to expedite geological investigation, and also to promote greater prospecting activity, in Canada.

    Jan 1, 1941

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    Problem Identification for Low Gold Recovery and Application of Treatment at Somita Plant

    By B. Roy

    The Somita plant processes low sulphide gold ore in Burkina Faso with a CIL process. After experiencing recurrent low gold recoveries, Somita undertook an investigation on the source of the problem. C

    Jan 1, 2014

  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles

    By M. C. Bétournay

    Hydrogen fuel cells are a known technology, having been applied to stationary (e.g. equipment, buildings, and power plants) and vehicle applications (e.g. transit buses and space shuttles). There is c

    May 1, 2005

  • CIM
    Gold Gravity Recovery at the Mill of Les Mines Camchib Inc., Chibougamau, Québec

    By L. Lui, A. Cauchon, A. R. Laplante

    "The gravity circuit at Les Mines Camchib Inc. consists of two pinched sluices to bleed a feed to one of two 76 cm (30"") Knelson concentrator. The Knelson concentrate is upgraded to smeltable grade w

    Jan 1, 1990

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)

    By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson

    "Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu

    Jan 1, 2005

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane (ef6c9811-507f-4964-b191-8a798691efa4)

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003