Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    OMC Power-Based Comminution Calculations for Design, Modelling and Circuit Optimization

    By P. Scinto, A. Festa

    "Orway Mineral Consultants Ltd (OMC) as a consultancy has specialized in comminution circuit design for over 30 years. The OMC Power Model is OMC’s in-house software for specific grinding energy power

    Jan 1, 2015

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • CIM
    Grinding: Why So Many Tests?

    By Alex Doll, Derek Barratt

    "There is a number of comminution tests commonly used in the mining industry. Many of the tests are used for a particular grinding model or mill sizing program and are incompatible with other tests of

    Jan 1, 2011

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Drum Hoisting in North America ? Approach to Design

    By Mike Robotham

    When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right

    May 1, 2011

  • CIM
    Méthode long trou à la Mine Mouska

    By Karl Marquis

    La Mine Mouska exploite depuis deux ans certains blocs de réserve à l?aide de la méthode long trou. Même si, à priori, la méthode long trou semble rentable, le contrôle de la dilution ainsi que le res

    Oct 1, 2001

  • CIM
    Co-Dependencies in Copper: Production, Price and Innovation Trends 1900–2018

    By Andrew Bamber

    Between the early 20th Century and the present, the production of mined copper ore has increased from tens of millions of tonnes per annum to several billion tonnes per annum, an unprecedented increas

    Jan 1, 2019

  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • CIM
    Huckleberry Mines Ltd. Process Design and Project Startup

    By Greg Rasmussen

    "Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b

    Jan 1, 1998

  • CIM
    Pneumatic Flotation as Key for the Ultra Fine Flotation of Different Ores and Minerals

    By Lutz Markworth, Evren Ören

    "The worldwide demand of ores and the depletion of the high-purity deposits make it necessary to recover ores in increasingly finer size fractions in the feed material. The flotation technology of mor

    Jan 1, 2009

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Coal Preparation

    By G. A. Vissac

    METHODS of coal preparation have been greatly developed and improved during the past few years. Under the pressing competition from substitutes that have been displacing coal as a source of heat or po

    Jan 1, 1937

  • CIM
    Vegetative Studies on Sulphide and Slag Tailings

    By E. M. Watkin

    "Although Canada has achieved one of the highest living standards in the world, people and organizations have, over the past decade, begun to question the cost and means of this achievement. Concern h

    Jan 1, 1975

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault

    By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak

    "By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important

    Jan 1, 2009

  • CIM
    Textural Analysis Provides Clue to Poor Ground Conditions in a Saskatchewan Potash Mine

    By A. Dave Mackintosh

    In 2001, at the CIM AGM in Quebec, a paper discussing poor ground conditions in a newly opened area at Agrium?s Vanscoy Potash Operation?s, suggested load transfer around old workings as a possible re

    Apr 1, 2005