Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Continuous Improvement of the Return Air Raise Silencer System at Totten MineBy Andrew Dobson, Cheryl Allen, Enrique Acuña
"Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p
Jan 1, 2019
-
Development Of Wasteless Technology Of Copper Extraction From Sulphide OresBy G. S. Ospanova
The results of complex processing sulphide copper ore and advantages of recovery of copper by vat and heap leaching, sorption, cementation and electrolytic solutions processing and utilization of wast
Jan 1, 2007
-
Selected Compositions Sulfhydryl Collectors and Flotation Kinetics of Sulfide Minerals from Refractory Pyrite Pyrrhotite Ores of Non Ferrous MetalsBy Vladislava A. Ignatkina, Fillip O. Milovich, Vladimir A. Bocharov
"Complex research of flotation concentrates of monomineral fractions of chalcopyrite, sphalerite, galena, pyrite, pyrrhotite included methods of adsorption of collectors, surface compounds by IR ATR,
Jan 1, 2016
-
A Geological Reconnaissance of the East End of Great Slave LakeBy Carl Lausen
Within recent years several mining companies have sent expeditions co the east end of Great Slave lake co determine the mineral possibilities of that area. Little was known of the geography of the reg
Jan 1, 1929
-
DEM Study of the Mechanical Behavior of a Leached Interface Upon ShearingBy C. Lambert
It has been shown that contacts between host rock and engineered barriers may be critical in the design of deep radioactive waste repositories. Water is expected to reach the interface zone after the
May 1, 2009
-
Failure Analysis of Austenitic Stainless Steel Tubes in a Gas Fired Steam HeaterBy N. Parnian
"Carryover of caustic soda (NaOH) in the steam path caused catastrophic failure of superheater 304H stainless steel tubes in a steam generator and led to an unexpected shutdown after just five months
Jan 1, 2012
-
A Novel Method for Dewatering of Iron Ore Tailings Based on Separation of Fine and Coarse FractionsBy M. Saghaeian, R. Hejazi, Fakoor Sanat Tehran Company, H. Abedini, M. Zare
"Dewatering of final tailings is one the biggest issues in iron ore processing plants. Because of the fine and hydrophilic particles in the iron ore tailings, dewatering of such material is difficult
Jan 1, 2016
-
Welding -A Useful Maintenance ToolBy H. Thomasson
This paper will deal with on-site maintenance welding using the stick electrode, electric arc process. It is primarily concerned with the underlying principles, the application of which, or the lack o
Jan 1, 1967
-
Characterization of inclusions in steel: When not only size mattersBy C. Blais, G. L’Espérance
Characterization of second phase particles is important with regard to their influence on mechanical properties of materials. Analytical electron microscopy offers the possibility to achieve complete
Jan 1, 1998
-
Geology of the Waite-Ackerman-Montgomery Property Duprat and Dufresnoy Townships, QuebecBy J. E. Gill
Introduction During the past summer, detailed geological mapping was extended to cover the entire group of 31 claims owned by Waite-Ackerman-Montgomery Mines, Ltd., and considerable new information w
Jan 1, 1932
-
Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., LimitedBy K. V. Lindell
Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of
Jan 1, 1948
-
Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite OreBy S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian
"The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota
Jan 1, 2016
-
Corefco Refinery – Review of Recent Operational ChangesBy J. Budac, J. Dennett, D. Mayne, P. Nawrocki
"The Nickel/Cobalt operation in Fort Saskatchewan, Alberta has successfully used an oxidative ammonia leach process to refine a variety of feeds into high quality nickel and cobalt products for over 6
Jan 1, 2017
-
The Highmont Copper-Molybdenum Deposits, Highland Valley, British ColumbiaBy A. J. Reed, W. R. Bergey, Carr. J. M.
"The Highmont copper-molybdenum deposits are at Gnawed Mountain in the Highland Valley porphyry copper district, 125 miles northeast of Vancouver. This district is near the center of the lower Jurassi
Jan 1, 1971
-
Cu – Ni Concentration Gradient Alloy for Antimicrobial Efficacy TestingBy H. A. Khorami, T. Wong, B. Velapatino, E. Asselin, T. Donnelly, E. Bryce, R. Dixon
A copper–nickel concentration gradient alloy was designed and fabricated through a powder metallurgy (PM) process. Copper and nickel powders were mixed with different weight ratios from 0 to 100% copp
Jan 1, 2019
-
Ancillary Services and Facilities at TasuBy H. M. Thurgood, F. A. Godfrey, F. W. Gilbert
This is a detailed presentation of the ancillary facilities, including power production, water supply, shiploading facilities, fire-fighting equipment, housing and community services. Additional subje
Jan 1, 1968
-
Interaction Mechanism of Yielding Rock Bolt and Matrix MassBy Yujing Jiang, Xuezhen Wu, Bo Li, Tomomi Iura, Gang Wang
"Yielding bolt has been widely used for rock reinforcement in mining and civil engineering in high stress conditions. However, the interaction mechanism of yielding bolt and matrix mass is still not c
Jan 1, 2015
-
Enhanced Ettringite Process- A Novel Solution for Sulfate RemovalBy Tuomas van der Meer, Jukka Tanninen, Annukka E. Mäkinen, Mika Martikainen, Laura M. Nevatalo
The mining industry consumes huge water volumes and the waste streams typically contain sulfate, which has caused problems to many operations around the world. Discharge of sulfate to fresh waters is
Jan 1, 2014
-
A Thermo-Chemical Model of the Peirce - Smith Copper Converter: Part I. Slag Making StageBy M. Aushouri, S. H. Mansouri, N. Aminizadeh
A thermo-chemical model of the Peirce-Smith copper converter has been developed to predict the molten temperature. The primary assumption of the model was that all matte, slag and gaseous phases in th
Jan 1, 2007
-
The Goldstrike pressure oxidation plant process and engineering design, construction and commissioningBy K. S. Fraser, H. J. H. Pieterse
"A pressure oxidation plant to pretreat refractory sulphide ore at the Goldstrike plant in Nevada, was commissioned in early February 1990. The plant, with a nominal capacity of 1363 t/d, was commissi
Jan 1, 1992