    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    An international review of the use and testing of the wire ropes used in mine hoisting

    By J. E. Udd

    "In early 2000, CANMET-MMSL was engaged by the Ontario Ministry of Labour (OMOL) to conduct an international study of the practices, in several key mining jurisdictions, of determining the criteria th

    Jan 1, 2004

  • CIM
    Production Trends and Economic Characteristics of Canadian Gold Mines

    By M. Doggett

    All 231 Canadian primary gold mines that produced from 1946 to 2004 were analyzed with respect to their production and economic characteristics. Trend analysis revealed that the average annual capacit

    Jan 1, 2007

  • CIM
    Sustainable Optimisation of the Bell Creek Sag Mill

    By T. Banerjee, D. Felsher, G. Leavoy

    "Lake Shore Gold is engaged in commercial gold production at both the Timmins West and Bell Creek mines, located in Timmins, Ontario. Run of mine ore is processed at the Bell Creek mill which consists

    Jan 1, 2015

  • CIM
    Reprocessing of a French Guyana Operation Tailings Using Flotation for Gold Concentration

    By P. Botane, A. Cailleau

    "Compagnie Miniere Esperance operates a gold primary ore body. The ore is processed through crushing, grinding and gravity concentration generating tailings with remaining fine gold. Analyses of the t

    Jan 1, 2009

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    Risk Adjusted Cash Flows: Discount Rates, Risk & Long Life Projects

    By L. D. Smith

    Net Present Value Impact of Discount Rate The Discounted Cash Flow (DCF) method of valuations is universally used and accepted. The main criticism of the method is that it does not recognize the val

    May 1, 2013

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • CIM
    Assessing the Value of Ventilation on Demand CIM Conference

    By Glenn Lyle

    CEMI Introduction ? Introduction of the CAF VOD Project ? Who are our partners ? What were the Outcomes What is next

    May 1, 2011

  • CIM
    Probabilities in Estimating the Grade of Gold Deposits

    By C. O. Swanson

    CALCULATING the average grade of a gold deposit is a problem that presents certain unique difficulties. Particularly troublesome is the fact that the average of the samples taken from a deposit is lik

    Jan 1, 1945

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • CIM
    Current Research in Mine Equipment Automation in Australia

    By Michael Hood

    An overview is given of some of the major mining research activities in Australia. Automation of mining equipment is not an objective in its own right. The objective is to improve the safety and the e

    May 1, 2002

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test - In memory of Professor Andre Robert Laplante - 1953-2006 Outstanding Mineral Processing Professor, Engineer and Scientist

    By Sunil Koppalkar, Liming Huang

    "Since late 1980s the research group led by late Professor Andre Robert Laplante at McGill University undertook fundamental studies and applied research of the Knelson Concentrator (KC) and developed

    Jan 1, 2007

  • CIM
    Symposium on Powder Metallurgy

    By Nicholas J. Grant

    It is the purpose of this paper to examine a number of the recent developments in powder metallurgy, being most concerned with those which are yet to prove themselves rather than those which have achi

    Jan 1, 1965

  • CIM
    Mogador Sulphide Deposit (Vendome Mines Limited)

    By P. R. Geoffoy, T. Koulomzine

    "The discovery of the Mogador deposit concealed by 100 feet of overburden was the result of combined application of geological reasoning, ground geophysical surveys, studies of glacial float and exten

    Jan 1, 1960

  • CIM
    The Next Milestone . . . . . .AccessDirectTM

    By Frank G. Wickert

    One key to maintaining successful mining operations in today?s global economy is in having the ability to access real-time machine operating data ([1] G. Brown, B. Ebacher, W. Koellner,2000)([2] Broch

    May 1, 2002

  • CIM
    Self-optimizing Grinding Control for Maximising Throughput while Maintaining Cyclone Overflow Specifications

    By Eduardo Nunez, Asim Tuzun, Dan Graffi, Glenn MacPherson

    "In preparation for the milling of a new nickel and copper mine ore, Nickel Rim South, Xstrata’s Strathcona Mill is undertaking numerous process improvement projects. Within the grinding circuit, seve

    Jan 1, 2009

  • CIM
    Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator

    By G. Cordingley, A. Mwanza

    Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an

    Jan 1, 2014