Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Permitted Explosives for the 21st Century

    By D Chalmers

    Drill and blast mining techniques are used to mine coal outburst prone and high gas content coals in Australia. As the risk of an outburst is increased in high gas content coal, it is considered that

    Jan 1, 2007

  • AUSIMM
    Strategic Sustainable Development – Creating Shared Value in the Mining Industry

    By M Jones, G Corder, A C. Keith

    "Sustainable development has become an issue of ever increasing importance to the mining industry. The Ernst & Young (EY) mining industry risk radar regularly shows several sustainability elements

    Jun 22, 2016

  • AUSIMM
    Equivalent Rock Column Design System for Tunnel Liners and Underground Structures Incorporating Rock Restraint

    An approximate rapid design system for tunnel liners and underground structures is presented which permits the effects of structure geometry and stiffness, rock quality in terms of its deformation

    Jan 1, 1976

  • AUSIMM
    A New Approach to Metallurgical Accounting

    By S Brochot, M-V Durance

    In many cases, current metallurgical accounting practice does not consider the errors associated with the measurements used in obtaining the metal balance. Considering all measurement errors, includin

    Oct 29, 2012

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012

  • AUSIMM
    An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore Treatment

    By S Farrokhpay, C Akop

    Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from

    Sep 1, 2014

  • AUSIMM
    Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite Feed

    By R Jones

    OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene

    Jul 11, 2011

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Breakthrough in elliptical motion screen trial delivers significant performance

    By D Teyhan, J Kirsch

    Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive

    Aug 24, 2022

  • AUSIMM
    Measuring spatial domain models’ uncertainty for mining industries

    By S A. McManus

    With the advances in software speed and capability, many of us now are running multiple scenarios on entire models rather than just testing small areas or a few blocks. In the authors experience both

    Mar 22, 2022

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    The Geology of the Eastern Distributor Tunnel

    By T R. Justice

    The Eastern Distributor tunnel is located approximately 24 m beneath the suburbs of Woolloomooloo and Darlinghurst to the east of the central business district of Sydney. The 1.7 km long tunnel will c

    Jan 1, 1999

  • AUSIMM
    Ore Pass and Chute Maintenance at Xstrata Copper ù Mount Isa Copper Operations

    By L E. Krause

    This paper discusses the considerations for optimum maintenance of critical ore handling infrastructure in order to minimise the cost to the business of maintenance periods. As maintenance periods are

    Jan 1, 2005

  • AUSIMM
    Mineral Industry Education in the 21st Century - Trends and Changes

    By Reynolds JO

    This contribution by. The Australasian Institute of Mining and Metallurgy has three main thrusts. First, an Institute (and industry) view on academia and the need for more entrepreneurship at top

    Jan 1, 1986

  • AUSIMM
    Structural Geology of the Emily Ann Nickel Deposit and Implications for the Mining Process

    By R Buerger, D Barrett, P Hodkiewicz

    The Emily Ann nickel mine is owned and operated by LionOre Mining International Ltd. The deposit was discovered during 1997 and is blind, concealed beneath 25 m of transported cover and a further 100

    Jan 1, 2003

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    Incorporation of ore sorting into a proposed greenfields tin mining and processing project in Morocco

    By A N. Parry

    In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm

    Nov 10, 2020