Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development of Hunter Valley Coal Preparation Plant

    By White PJ, Worrad C

    The Hunter Valley Coal Preparation Plant and associated materials handling facilities commenced operation in mid 1982. The new plant and coal handling system were designed to integrate with existing m

    Jan 1, 1985

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    A Geometallurgical Approach for Iron Ore Product Evaluation

    By B J. Beven, A Vatandoost, J Young, S Campbell-Hardwick

    The intrinsic value of iron ore depends on its physical and chemical characteristics. For example, silica and alumina are unwanted elements, downgrading iron grade and adversely affecting high tempera

    Sep 29, 2013

  • AUSIMM
    Globally Optimising Open Pit and Underground Mining Operations under Geological Uncertainty

    By R Dimitrakopoulos, K Kawahata, L Montiel

    A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci

    Nov 24, 2014

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground Crusher

    The low grade Mount Charlotte orebody was first mined with minimum capital expenditure by mechanised cut and fill stoping. The lower block was prepared simultaneously for open stoping by shaft sink

    Jan 1, 1973

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    Rio Tinto Floating Module

    By N Vagias, R Shaw, M Coghill, W Easman

    Rio Tinto Technology and the Rio Tinto Foundation for a Sustainable Minerals Industry have funded the development of a practical floating module that can reduce water losses through evaporation from w

    Jan 1, 2006

  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    Supergene Ore at the Girofla Mine Mungana

    The Mungana group of mines, in the Chillagoe district, yielded 334,000 tons of ore giving 31,831 tons of lead, 7,907 tons of copper and 3,228,600 ounces of silver. The Girofla mine produced approximat

    Jan 1, 1953

  • AUSIMM
    Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to Implementation

    By B Belle

    In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang

    Aug 31, 2015

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Specialised Equipment and Mining Techniques for Narrow Vein Mining

    By D Moss, P Ganza

    There are continuing developments in underground narrow vein mining, from innovative mining methods using low-profile equipment to adaptations of current mining methods using equipment such as road-he

    Jan 1, 2005

  • AUSIMM
    Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge

    By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch

    Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a

    Sep 17, 2014

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Mining a Narrow Ore Body - Innovative Mining and Blasting Methods

    By LeJuge G. E, McKenzie C. K

    Innovative mining and blasting techniques were demanded at the Richmont Mines, Francoeur Mine in Quebec, Canada, by a narrow, shallowly dipping high grade gold ore body. The ore body being mined oc

    Jan 1, 1992

  • AUSIMM
    Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wear

    By S Slouka

    Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a

    Oct 12, 2022