Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tunnel Boring Under Stockholm City

    Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation f

    Jan 1, 1987

  • AUSIMM
    The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical Simulation

    By Q Yu, G Ren, Z-Y Chen, J Yang

    The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole

    Aug 24, 2015

  • AUSIMM
    Grade control and deleterious materials in polymetallic deposits

    By R J. Goldie

    The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During

    Mar 22, 2022

  • AUSIMM
    ‘It Seemed Like a Good Idea at the Time ...’ Common Mistakes in Geometallurgy

    By P Kittler

    In the spectrum of mining-related disciplines, geometallurgy sits between resource geology and metallurgical engineering. Unlike its neighbours, it is a relatively young discipline and its concepts, p

    Sep 5, 2011

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western Australia

    By Klenowski G, Gilmour G. A

    The Metropolitan Water Supply, Sewerage and Drainage Board, Perth, has recently con- structed two major sewerage tunnels in the metropolitan area and a further one is under construction. These tunne

    Jan 1, 1981

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Koongarra-The Rolled by Years and Costs

    The Koongarra uranium deposit was discovered in August 1970 by Noranda Australia Limited. Denison Mines Limited acquired the rights of ownership in October 1980 and has continued the 'struggl

    Jan 1, 1984

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.

    By Howell M. W

    The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a

    Jan 1, 1940

  • AUSIMM
    Geology and Mineral Potential of the Ranger Project Area, Northern Territory

    The Ranger Project Area covers 78.6sq km and is approximately six km east-west by 14km north-south (Fig. 1). The area is known to con- tain two uranium orebodies, Ranger No. 1 and No. 3, two uraniu

    Jan 1, 1984

  • AUSIMM
    Study of prevention methods for stress corrosion cracking in underground coalmines

    By A Crosky, S Saydam, H Chen, H L. Ramandi

    Cable bolts and rock bolts are used as primary and secondary anchoring systems in many underground mines. Reports on the premature failure of cable bolts and rock bolts due to stress corrosion crackin

    Nov 29, 2022

  • AUSIMM
    Multiple Indicator Kriging - Is it Suited to My Deposit?

    By D Guibal, J Vann, M Harley

    Many sample value distributions are highly skewed and present variograms with high relative nugget effects and/or short-range structures. In consequence, significant deskewing of the histogram and var

    Jan 1, 2000

  • AUSIMM
    Diesel Particulate Matter in Underground Mines ù Controlling the Risk

    By F Djukic, T Fisher, G Irving

    Questionnaires were sent to 12 underground metalliferous mines in Queensland to enquire how these mines control diesel emissions from mobile diesel engines used underground. Where responses or control

    Jan 1, 2007

  • AUSIMM
    Prognostic models for electroslag remelting process and slag engineering

    By D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar

    Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree

    Aug 21, 2024

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    The Edie Creek Vein System and Bulolo Graben

    By Corbett GJ

    The Bulolo Graben represents an intra-arc rift formed by activa- tion of transfer structures in an extensional setting formed be- tween the eastern and western sectors of the New Guinea Origin. Crust

    Jan 1, 1997

  • AUSIMM
    Fundamental Sampling Error and Sampling Precision in Resource Estimation – A Discussion

    By N Schofield

    For the sampling of particulate materials in mineral exploration and mining, the fundamental sampling error (FSE) introduced by Gy is a measure of the constitutional heterogeneity of the sample lot an

    Aug 22, 2011

  • AUSIMM
    U.S. Bureau of Mines Research in Advanced Mining Technologies

    The Bureau of Mines, with a history of mining research since 1910, still seeks improvement in safety and health along with improvement and competitiveness in the mining industry. Much promise of such

    Jan 1, 1991