    A Hydrometallurgical Scheme for New Zealand Sulphide Ores

    By Kelly E. G

    New Zealand suffers the disadvantage of widely scattered ore bodies, none of which is large enough to economically support its own smelter. This leads to the concept of a centrally located smelter

    Jan 1, 1980

  • AUSIMM
    Olivine Reactions During Pelletising of Magnetite Ore at High Temperature Under Oxidising Conditions

    Magnesium-rich olivine is used as an additive in LKABÆs iron ore pellets in order to improve the high-temperature properties of the finished products. Olivine is only added to the pellets that are man

    Jan 1, 2008

  • AUSIMM
    The Economic Feasibility of Recirculation in Underground Mines

    By Gostylla W

    The economic feasibility of controlled district cross-cut recirculation is examined in this paper with particular reference to the most important mine ventilation network parameters. An algorithm i

    Jan 1, 1988

  • AUSIMM
    Rheological Hypothesis of the Coal and Methane Outburst Mechanism

    By Xueqiu H

    Since the hypothesis of coal and methane outburst mechanisms based on elastic mechanics gives no consideration to time, it cannot give satisfactory explanation of the outburst occurrence and its devel

    Jan 1, 1992

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Air-core imaging in a hydrocyclone using non-invasive ERT Technique – effect of reconstruction algorithms

    By N Mangadoddy, P Jampana, S Diddi

    The study of air-core dynamics in hydrocyclone operation is essential for predicting separation efficiency in mineral processing. Electrical resistance tomography (ERT) allows non-invasive measurement

    Aug 24, 2022

  • AUSIMM
    Technology integration for tailings storage facility construction

    By A R. Hollis, M Heddon

    The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four activ

    Jul 1, 2021

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    The Control of Rotary Vacuum Filters in a Gold Recovery Plant

    By Peverett N. F

    The purpose of filtration in a gold reco- very plant is to separate the gold bearing liquid from the solids in the slurry. Some of the gold is inevitably lost due to incomplete separation. An inves

    Jan 1, 1977

  • AUSIMM
    Recruiting for an Underground Workforce at Cannington

    By A G. L Pratt, M S. Kemp

    BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to

    Jan 1, 1998

  • AUSIMM
    Are Mining Geologists Really Necessary?

    Alternatively are they a necessary evil'? Exploration geologists are a much higher profile group but then again the higher they are the bigger they Bill. At a mine site they are reluctantly being

    Jan 1, 1997

  • AUSIMM
    A Casting Method for Artificial Rock Specimens

    By Mostyn G. R

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e.

    Jan 1, 1992

  • AUSIMM
    Relationship of Joint Orientation with Hole Spacing Parameter in Multihole Blasting

    By Badal R

    Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma

    Jan 1, 1990

  • AUSIMM
    Application of Simulation Models to Port Planning and Management

    By Mahoney BK

    The development of simulation models to reflect accurately the operations of a port and its associated transportation systems can be an expensive and time consuming process. However the complexity

    Jan 1, 1983

  • AUSIMM
    Myuna Multi Seam Colliery Ventilation

    Myuna Colliery long term ventilation requirements were included as part of the overall planning of colliery construction and underground development. Ventilation, during the simultaneous sinking of

    Jan 1, 1983

  • AUSIMM
    Practical Ventilation Planning for Mine Management Using a Digital Computer

    By Hempenstall J, English W

    Mine management has a responsibility under the various acts of state parliaments for the adequate ventilation of existing workings. It also has a need to plan adequately for the ventilation of pro

    Jan 1, 1983

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Geomechanics Considerating In Optimistc The Use Of Mine Fill Part B

    By Kurzeme M, Willoughby D. R

    Current research at the CSIRO, Division of Applied Geomechanics, into the mode of response of fill as a structural component has been based on model tests for prediction of behaviour and field obs

    Jan 1, 1973

  • AUSIMM
    Guidelines for Economic Evaluation of Projects

    By P Card

    “Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should

    Aug 8, 2011

  • AUSIMM
    Probablistic Analysis of Risk in Mining Projects - As Easy as 123

    By Dorricott M. G, McAllister J

    This paper is concerned with the application of a probabilistic approach to the risk assessment of mining projects.In current practice, sensitivity analysis is the most commonly used deterministic app

    Jan 1, 1992