Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Mine Project Risk ManagementRisk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate
May 24, 2012
-
Maximising resource utilisation in South Africa – the BIF storyBy A Singh, C Da Corte
Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m
Nov 8, 2021
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
A Review of Recent Studies in the Pine Creek Geosyncline with Special Reference to UraniumThe Lower Proterozoic metasediments of the Pine Creek Geosyncline form a chrono- stratigraphic sequence of mainly greenschist- and amphibolite-grade shallow-marine to supratidal pelites, psammites, c
Jan 1, 1979
-
Mt Wright – managing unique risksBy S Long, D Carnovale, L Louwrens
The Mt Wright underground mine (MTW) is located near the town of Ravenswood in north Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited.The Mt Wright
Oct 16, 2017
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
The Frieda River Project – a Novel Approach to Analysing Exploration Drill Core: How Broken is Broken?By D La Rosa, D Bennett
"Exploration drill core provides for a number of standard measurements essential for determining the viability of a new mine or the extension of an existing one. Rock lithology and alteration can be v
Jun 15, 2016
-
The Need to optimiseMANPOWER RESOURCES The optimisation of human effort has been an ongoing and significant process in the coal industry since industrialisation as we know it began. The extent to which the changes soug
Jan 1, 1991
-
Thiosulfate Processing - From Lab Curiosity to Commercial ApplicationBy J Langhans, Y Choi, Q Wang, J Y. Baron, P Kondos
Barrick has successfully developed the thiosulfate leaching process to treat sulfidic high preg-robbing ores. The process was developed through rigorous bench test programs and proved in pilot campaig
Sep 26, 2013
-
Reducing the Effect of Wind on Airblast Measurement During BlastingBy K Henley
One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic
Aug 24, 2015
-
Reducing the Cost of Tunnel Design in AustraliaBy B Rouvray, R Bertuzzi
The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document
Sep 17, 2014
-
Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley CoalminesBy M L. Cramer, N P. Wines
"On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a
Jun 28, 2016
-
Improving the Granulating and Sintering Performance by Pretreating Concentrates Using a Roller PressBy D Q. Zhu
In this paper, the pretreatment of concentrates by roller press was present to improve the granulation of blends comprising some 30 per cent iron ore concentrates and enhance the sintering performance
Jul 11, 2011
-
An Integrated Technology Solution for Optimised and Environmentally-controlled BlastsBy C Parihar, R Garg, A Bhandari, S Bhandari
Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for
Aug 24, 2015
-
Statistics Collection and its Importance to the Northern Territory GovernmentBy K Hooper
Over the past 20 to 30 years statistics as a science has grown in significance. Not a day passes without reference to the latest statistics by the print, audio and audio-visual media. The Northern T
Jan 1, 1994
-
From Banded Iron Formation to Iron Ore – Genetic Models and Their Application in Iron Ore Exploration in the Hamersley Province, Western AustraliaBy H J. Dalstra
High-grade iron ore may be derived from banded iron formation (BIF) through four fundamentally different processes:1. syngenetic precipitation of chert free BIF,2. residual enrichment by removal of ga
Jul 11, 2011
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD ModellingBy A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006