Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Extractive Industry - Sustainability Information Systems

    As the title indicates the central themes discussed in this contribution are sustainable development, information systems, and extractive industry. More specifically, the objective is to present a pro

    Jan 1, 2009

  • AUSIMM
    Copper Metallurgy and the SOx Problem in Japan

    As a result of the rapid economic growth in Japan, environmental problems have become a national concern in the latter half of the In 1967, the Basic Lair for Environmental Pollution Control was en

    Jan 1, 1980

  • AUSIMM
    High Quality Performance of Segmental Lined Tunnels

    Tunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi

    Jan 1, 1999

  • AUSIMM
    How the Use of Market-Based Risk Metrics can Undervalue Good Mining Projects and Overvalue Poor Ones

    By T Y. Dube

    In this paper current net present value (NPV) based mine valuation techniques that take into account market and private risk are discussed and analysed. Potential pitfalls that arise from the applicat

    May 24, 2012

  • AUSIMM
    Integrated Automatization of Longwall Mining System

    By Esaki M, Nishimura K

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Mentoring and Your Career

    Young professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec

    Jan 1, 2006

  • AUSIMM
    Screening Efficiency Revisited

    As partition curves are widely employed to characterize screening efficiency which, by definition, should include a time parameter, it is shown, perhaps for the first time, that time is already in

    Jan 1, 1984

  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    Remnants of Ancient Australia in Vanuatu – Implications for South-west Pacific Tectonics and Mineralisation Potential

    By S W. Richards, J Buys

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Magmatic arcs are prime targets for porphyry- and epithermal-style mineral deposits, althou

    Mar 18, 2015

  • AUSIMM
    Fine Coal Dewatering by Compaction in Bins Exhibiting Reliable Discharge

    This paper firstly reviews the requirements for container and hopper design for reliable discharge. Discussion is then directed to the evaluation of the consolidation stresses acting in both in both t

    Jan 1, 1998

  • AUSIMM
    Orebody Delineation and Reserve Estimation ù Seeking Common Sense from Extensive Investment in Fact

    The organisers of this function have suggested that this presentation should accomplish the following broad goals:set the technical tone for the conference to follow, implying some discussion of the æ

    Jan 1, 2000

  • AUSIMM
    Hydraulic Backfilling At Homestake

    The hydraulic backfilling of mine tailings has proven very successful at the Homestake Mine in Lead, South Dakota. It allows greater versatility, selectivity and safety in mining. It has also mini

    Jan 1, 1973

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    Unmanned Aerial Vehicles for Mine Environment Monitoring

    By P J. Cullen, B P. Banerjee, S Raval

    Continuous monitoring of mining impacts on the surrounding environment is a necessary sustainability criterion. Traditional monitoring approaches such as in situ sampling and airborne and satellite-ba

    Nov 4, 2015

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Development of the Eneabba Mineral Sands Operation of Associated Minerals Consolidated Limited

    By Bassett N

    The Eneabba deposit, located 280 km north of Perth, Western Australia, and 30 km inland (Fig. 1) is one of the most recently developed deposits of mineral sands in the world. The area has been in

    Jan 1, 1979

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    Results of Radiometric Surveys in the Alligator River and Cobourg Peninsula Area of the Northern Territory

    The Bureau of Mineral Resources has been engaged in regional geological and geophysical field work in the Alligator River and Cobourg Peninsula area since 1971, following the discovery of major ura

    Jan 1, 1975