Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Metallugical Plant ù Have We Run Out of Developments?

    I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam

    Jan 1, 2002

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Application of Turbo Pulp Lifter in Greenfield Operation - Mirabela SantaRita Nickel Operation

    By A Moreira, A B. De Souza, S Latchireddi, E Faria

    Material transport plays a significant role in the efficiency of horizontal grinding mills - autogenous (AG)/semi-autogenous (SAG)/ball mills. The magnitude of benefits that can be achieved with effic

    Oct 29, 2012

  • AUSIMM
    Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) Method

    Vertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e

    Jan 1, 2005

  • AUSIMM
    A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting process

    By A Kamaraj, M Mohanasundaram, R Kumar, P Tikare

    This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig

    Aug 21, 2024

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    The Petrology and Mineralization of The Coolac Serpentine Belt East of Brungle, New South Wales

    A belt of serpentinized ultrabasic rocks intrudes a moderately folded geosynclinal sequence of fine to coarse sediments, acid, intermediate, and basic volcanics as well as a batholithic mass of granit

    Jan 1, 1969

  • AUSIMM
    Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ

    Jan 1, 1980

  • AUSIMM
    Rwanda and the Africa Mining Vision

    By I H. Wilson

    After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa

    Jul 16, 2014

  • AUSIMM
    Tailings process optimisation through automation and controls integration

    By R Williams, M Baxter, D Zink, R Cunningham

    The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi

    Jul 23, 2018

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    Practical Considerations and Shortcuts in Sampling

    By D M. Frantois-Bongarton

    "A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem

    Aug 21, 2012

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North

    By R Beaulieu, D Burlingame, C Hanks

    The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development

    Jan 1, 2002

  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    Geostatistical Ore Reserve Estimation For The Warrego Mine, Northern Territory

    By Leahey T. A

    The variability of gold mineralization in the Warrego Gold Pod is described by classical statistical techniques using sample distrib- utions and analysis of variance; and by the use of geostatistic

    Jan 1, 1979

  • AUSIMM
    The McArthur Lead-Zinc-Silver Deposit, N.T.

    The McArthur lead-zinc-silver deposit is of the stratiform type. It consists essentially of a mineralized bituminous shale sequence that incorporates tuffites, numerous graded beds, and isolated but m

    Jan 1, 1972