Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Building Sustainability Into a ProjectOrganisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti
Jan 1, 2004
-
Metallugical Plant ù Have We Run Out of Developments?I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam
Jan 1, 2002
-
Particle Size Analysis – Optimising Returns in Iron OreBy B Stump
Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal
Jul 11, 2011
-
Application of Turbo Pulp Lifter in Greenfield Operation - Mirabela SantaRita Nickel OperationBy A Moreira, A B. De Souza, S Latchireddi, E Faria
Material transport plays a significant role in the efficiency of horizontal grinding mills - autogenous (AG)/semi-autogenous (SAG)/ball mills. The magnitude of benefits that can be achieved with effic
Oct 29, 2012
-
Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) MethodVertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e
Jan 1, 2005
-
A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting processBy A Kamaraj, M Mohanasundaram, R Kumar, P Tikare
This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig
Aug 21, 2024
-
Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case StudyThroughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c
Nov 25, 2010
-
Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturingBy Z Li, Z Yan, T Htet, S Zhang
During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta
Aug 21, 2024
-
The Petrology and Mineralization of The Coolac Serpentine Belt East of Brungle, New South WalesA belt of serpentinized ultrabasic rocks intrudes a moderately folded geosynclinal sequence of fine to coarse sediments, acid, intermediate, and basic volcanics as well as a batholithic mass of granit
Jan 1, 1969
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980
-
Rwanda and the Africa Mining VisionBy I H. Wilson
After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa
Jul 16, 2014
-
Tailings process optimisation through automation and controls integrationBy R Williams, M Baxter, D Zink, R Cunningham
The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi
Jul 23, 2018
-
Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, SwedenBy M Svartsjaern, D Saiang and K Mäkitaavola
The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The
May 9, 2016
-
Practical Considerations and Shortcuts in SamplingBy D M. Frantois-Bongarton
"A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem
Aug 21, 2012
-
A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out TestsThis study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.
Dec 6, 2010
-
Prediction of Subsidence Due to Longwall Mining at West Cliff CollieryBy Shu DM, Moxon P
Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile
Jan 1, 1986
-
The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs NorthBy R Beaulieu, D Burlingame, C Hanks
The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development
Jan 1, 2002
-
Sampling and blending in geoenvironmental campaigns – current practice and future opportunitiesBy A Parbhakar-Fox, S C. Dominy
The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact
May 9, 2017
-
Geostatistical Ore Reserve Estimation For The Warrego Mine, Northern TerritoryBy Leahey T. A
The variability of gold mineralization in the Warrego Gold Pod is described by classical statistical techniques using sample distrib- utions and analysis of variance; and by the use of geostatistic
Jan 1, 1979
-
The McArthur Lead-Zinc-Silver Deposit, N.T.The McArthur lead-zinc-silver deposit is of the stratiform type. It consists essentially of a mineralized bituminous shale sequence that incorporates tuffites, numerous graded beds, and isolated but m
Jan 1, 1972