Search Documents

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • AUSIMM
    Pumping Machinery for Mines, with Special Reference to the Plant at the Waihi Mine, N.Z.

    THE choice of a pumping plant for the drainage of a mine is a matter of such importance that it is obvious that in a short paper it is impossible to go fully into the reasons governing the adoption of

    Jan 1, 1912

  • IIMP
    Integración y optimización de procesos de la mina a la concentradora – aplicación en la compañia minera antamina

    By Juliana Colacioppo

    La voladura es un procedimiento que está diseñado para obtener pilas a través de una fragmentación adecuada para el carguío y transporte, aumentando así la productividad de las palas y camiones y aseg

    Sep 9, 2007

  • AIME
    Mining - Mechanics of Longwall Caving

    By L. Adler

    Longwall caving, one of the most economical and attractive mining methods, is yet one of the most difficult and hazardous.1 This dualism is inherent in a method which manipulates the mine supports the

    Jan 1, 1961

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008

  • AIME
    Reservoir Engineering - General - Simplified Water Influx-Pressure Calculations Above the Bubble...

    By J. D. Rice, S. C. Pitzer, C. E. Thomas

    Interpretation of pressure build-up data obtained in the conventional manner has often been difficult because of the deviation from theoretical behavior. Major causes of this deviation have been attri

  • SAIMM
    Mechanization In Stoping Narrow Tabular Orebodies

    By R. J. Kendall

    As we enter the new millennium, the South African mining industry has to ensure that it becomes more competitive if it is to survive in the ever more demanding global environment. Traditionally, mech

    Jan 1, 2000

  • TMS
    Morphology Change Of AlN With Respect To Starting Materials In SHS Process

    By Jae R. Lee

    Keywords: Self-propagating high temperature synthesis, AlN, Powder synthesis The particle size and shape effects of starting raw powders on the synthesis of aluminum nitride by self-propagating hig

    Jan 1, 2005

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • NIOSH
    OFR-59(3)-73 Phase II Final Report - Volume 3 Of 3 - Feasibility Study Of Surface Impregnation Equipment For The Chemical Stabilization Of Coal Mine Structures

    This report summarizes the work performed and results achieved on the above contract from October 18, 1971 through July 14, 1972 under Phase II, Task 1: Detailed Design of Prototype and Task 3: Suppor

    Jan 1, 1972

  • DFI
    Limitations Of Predicting Deformations During Excavation In Soft Clay ? Summary

    By Richard J. Finno

    Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated

    Jan 1, 1991

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • ISEE
    Wireless Electronic Blasting

    By Daniel Mallette, Richard Goodridge, C M. Lownds

    Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common

    Jan 1, 2016

  • SAIMM
    Tough choices facing the South African mining industry

    By W. van Antwerpen, J. Guzek, A. Lane

    Strategy is about making choices. Mining companies choose to do certain things and not to do other things. Mining is a long-term business, and the choices made typically have large investments attache

    Jan 1, 2015

  • NIOSH
    RI 3043 Use and Value of Air Analyses in Ill. Mines

    By A. U. Miller

    "Ventilation is one of the meet important factors in mining, although until recent years less thought has probably been given to effective ventilation than to any other one phase of mining. In the pas

    Oct 1, 1930

  • CIM
    Inspection Techniques - Non-Destructive Evaluation – Mill Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) Techniques

    By Tom Shumka

    "All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it be every six months to every three years. The inspection frequency dep

    Jan 1, 2012

  • DFI
    The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)

    By Christian Besson

    This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv

    Jan 1, 2002

  • NIOSH
    OFR-123-76 Evaluation Of Underground Conventional Mining Equipment

    By William J. Douglas

    This document describes the development of a conventional mining equipment data base, and an approach for conducting industrial engineering studies of arbitrary mining systems employing network techni

    Jan 1, 1976

  • NIOSH
    OFR-37-78 Development Of A Nonprimary-Explosive, Low-Voltage Electric Detonator For Use In Mining Operations

    By P. B. Ritter

    The feasibility of redesigning and adapting the all- secondary-explosive, low-voltage, electric safe detonator for use as a delay detonator has been demonstrated. Experimental results have shown that

    Jan 1, 1977