Search Documents

  • AUSIMM
    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Sep 13, 2010

  • TMS
    Novel Technology for Treatment of Acidic Wastewater Containing Mercury in Zinc Smelter by Biologics

    By Qingwei Wang

    This study focused on acidic wastewater from producing sulfuric acid system in zinc smelter containing mercury 21.48mg/L, zinc 55.85mg/L, lead 38.50mg/L, copper 1.68mg/L, cadmium 10.25mg/L, As 29.86mg

    Jan 1, 2009

  • CIM
    Enhancement of Flow Dynamics of Existing Flotation Cells

    By Timo Niitti, Antti Rinne, Janne Turunen, Sami Grönstrand

    "This paper describes novel methods to enhance the flow dynamics of a mechanical flotation cell that can be applied to an existing installation. There are several reasons to alter the flow dynamics. T

    Jan 1, 2006

  • CIM
    The Griffith Mine Energy Reduction Program

    By J. Frostiak

    "This paper describes some energy reduction measures Implemented at the Griffith Mine. Before proceeding, I will give you a brief overview of the operation.The Griffith Mine is an iron ore mining, con

    Jan 1, 1983

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • SAIMM
    Mine seismicity: prediction or forecasting? - Synopsis

    By S. M. Spottiswoode

    Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a sma

    Jan 1, 2010

  • NIOSH
    Measuring diesel particulate matter in underground mines using submicron elemental carbon as a surrogate (33b509e5-8040-43bc-84c7-70764ccb89c4)

    By J. D. Noll

    Elemental carbon (EC) is used as a surrogate for regulating the exposure to diesel particulate matter (DPM) of underground metal/non-metal miners. EC was chosen as a surrogate because EC is selective

    Jan 1, 2002

  • NIOSH
    IC 6383 Mining Bituminous Coal By Stripping Methods - I. Economic Analysis - Introduction

    By Scott Turner

    The present rapid growth of coal stripping in the United States is a curious reversal of the tendency of mining to proceed from outcrop to depth. A combination of technical and economic factors bas st

    Jan 1, 1930

  • CIM
    Galore Creek Project

    Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag

    May 1, 2006

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003

  • SME
    Seismic Upgrades of the Claremont Tunnel

    By Bill Cain, R. John Caulfield, D. Scott Kieffer

    The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl

    Jan 1, 2001

  • NIOSH
    IC 7355 Geophysical Abstracts 123 October-December 1945 - With An Index To Abstracts 120-123

    8186. Aquilina, C. Determinazioni relative di gravita eseguite nel 1939 (Relative Determinations of Gravity Made in 1939), Ric. Ingegn, Rome, vol. 10, 1942, pp, 6376. In 1939, the author made a sur

    Jan 1, 1946

  • NIOSH
    OFR-82-79 Analysis Of The Economic Feasibility For Development Of Coal Resources In The Narragansett Basin Of Rhode Island And Massachusetts

    This study assesses whether Narragansett Basin coal deposits could be developed commercially in the near future. To do this, we identify the potential market for the coal, assess the price these users

    Jan 1, 1979

  • CIM
    The Practice of Mining and Inclusive Wealth Development in Developing Countries

    By Frederick Bird

    This paper is based upon a review of studies of mostly Canadian mining companies in Chile, northern Canada, Tanzania, Guatemala, Ghana, Sierra Leone, and the Democratic Republic of Congo. In spite of

    Aug 1, 2013

  • SAIMM
    Slag Properties And Design Issues Pertinent To Matte Smelting Electric Furnaces (e3a20593-dc35-4fd2-9a1d-dff5bd2ffd2f)

    The effect of composition on electrical conductivity (resistivity), viscosity and liquidus temperature of the slags encountered in electric smelting of PGM-containing suphide concentrates is reviewed

    Jan 1, 2004

  • AUSIMM
    Chemistry of Cyanidation II: Complex Cyanides of Zinc and Copper

    By Woodcock J. T

    During the dissolution of gold in fully aerated cyanide solutions the CN ion is the active agent, and consequently the usual method of evaluating the dissolving power of such solutions is to determine

    Jan 1, 1950

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • AUSIMM
    Analysis of Progressive Seismicity and its Correlation with Geotechnical Variables at the El Teniente Mine

    By A Brzovic, E Córdova

    In an underground mine, different mining activities such as undercutting and cave progression generate redistribution in the present in situ stress field, and these changes are represented in the rock

    May 9, 2016