Search Documents

  • IOM3
    Evaluation of Box-Wilson experimental design in flotation research

    By T. Yalcin

    In the Box-Wilson method, the correlation between dependent and independent variables is represented by a polynomial response function, whose constant and coefficients are determined by applying regre

    Jun 21, 1905

  • AUSIMM
    Some Notes on Bank Deposits, With special reference to those met with at the Denny Dalton Goldfields, Vryheid District, South African Republic, and the Process of Treatment Employed There

    To many Australian Mining Engineers, we take it, the singular features of banket deposits are not as familiarly known as they would wish, possibly because in the majority of instances they are not in

  • AUSIMM
    The Occurrence of the Tellurides at Norseman, Western Australia

    Gold recovered on the strikes at the Central Norseman mill, Norseman, Western Australia, has an approximate assay fineness of 850. Bullion recovered from the cyanide plant at the mine is of much lower

    Jan 1, 1944

  • SME
    Globalization in the 21st Century Discussed at Colorado MPD Meeting

    By Steve Kral

    Globalization was the key word for the mining industry during the 1990s, just as productivity was the key word of the 1980s. And globalization will remain the key word as the industry enters the 21st

    Jan 1, 1999

  • AUSIMM
    Use of Large Twin-Power Scrapers in Prestrip Operations

    The use of scrapers in mining and earthmoving operations is not new, in fact they are one of the earliest methods of bulk earthmoving. A single machine which can load, haul, and dump material with a m

    Jan 1, 2003

  • SME
    Tunneling And Trenchless Technology Key To Charleston?s Infrastructure

    By Larry F. Drolet

    Charleston, SC is anything but boring. The city was founded in 1670 and has played a significant role throughout the history of the United States. Located along the coast of the Atlantic Ocean in the

    Jan 1, 2013

  • DFI
    Response to Load for Four Different Types of Bored Piles

    By Mario Terceros H., Bengt H. Fellenius

    "ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore

    Jan 1, 2014

  • AUSIMM
    Metallogenic Provinces and District in the Tasman Orogenic Zone of Eastern Australia

    The Tasman Orogenic Zone is regarded as a single metallogenic province (the Tasman Province) with four SUb-provinces corresponding with its major tectonic components: the Lachlan, New England, Hodgkin

    Jan 1, 1972

  • ISEE
    Optimization of Blast Fragmentation at Kisladag Gold Mine

    By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor

    This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade

    Jan 1, 2015

  • AUSIMM
    The Influence of Particle Shape in Rock Fracture

    The Influence of Particle Shape in Rock Fracture

    Sep 13, 2010

  • SAIMM
    In Search Of Low Cost Titanium: The Fray Farthing Chen (FFC) Cambridge Process - Synopsis

    By S. J. Oosthuizen

    This article explores the Fray Farthing Chen (FFC) Cambridge process, a novel method for the electrochemical deoxidation of metal oxides in molten salt, discovered at the University of Cambridge in 19

    Jan 1, 2011

  • NIOSH
    RI 8128 A Method for Computing Stabilization Pressures for Excavations in Incompetent Rock - With Computer User Information

    By J. D. Dixon

    This Bureau of Mines report describes a technique for determining the confining pressures that must be provided for stabilizing underground openings in incompetent rock. The technique is adapted for u

    Jan 1, 1976

  • AUSIMM
    Evolution of Semi-Autogenous Grinding Mill Control at Century Zinc

    By A Prinsloo, R Tewu

    Automatic control of semi-autogenous grinding (SAG) mills has often been considered complex. Recent experiences at Century Zinc (worldÆs second largest open pit zinc mine) refute this. Together with o

    Jan 1, 2009

  • TMS
    Thermodynamic Research of the Dissolving of Chrysocolla (Cusio3LH2O) in the Ammonia-Ammonium Chloride-Water System

    By Liu Wei

    In order to make clear the dissolving characteristic of the chrysocolla (CuSiO3?H2O) in the ammonia-ammonium chloride solution, a thermodynamic model of the chrysocolla (CuSiO3?H2O)-ammonia- ammonium

    Jan 1, 2010

  • AUSIMM
    Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.

    Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb

    Jan 1, 1949

  • SME
    Regulation Of Surface Subsidence In Nest Virginia

    By Steve Meador

    West Virginia's basic coal mining regulatory programs are not unique when compared to Federally approved programs implemented by other coal producing states. In fact, the language in The West Vi

    Jan 1, 1986

  • AUSIMM
    Revised Geology of the Tavua Goldfield Fiji

    Differentiation of a basaltic (?) magma occurred in an active volcanic area during the late Miocene and Pliocene, and a change in the general mode of extrusion from fissure flow for the basalt to expl

    Jan 1, 1962

  • AIME
    Application Of Pyrometry To Problems Of Lamp Design And Performance

    By I. H. Van Horn

    IN the development of the incandescent electric lamp one aim of the investigators has been to establish the fundamentals of lamp design, so that the performance of any new lamp may be accurately predi

    Jan 9, 1919

  • NIOSH
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008