Search Documents

  • DFI
    Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - Introduction

    By Patrick E. Durnal

    The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across

    Jan 1, 1998

  • NIOSH
    MLA 7-83 - Mineral Investigation Of The Lost Creek Rare II Area (No. 5089), Shasta County, California ? Summary

    By Harry W. Campbell

    A Bureau of Mines investigation identified no mineral deposits in the Lost Creek RARE II area. Sand and gravel has been mined from alluvial flood plain deposits just outside the RARE II boundary. An o

    Jan 1, 1983

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SAIMM
    The Determination Of The Residual Strength Of Hard Rock Crush Pillars With A Width-To-Height Ratio Of 2:1

    By D. P. Roberts

    This paper reviews the use of crush pillars on mines in the Bushveld Complex and the Witwatersrand Supergroup. Stress measurements were undertaken in order to determine the residual strength of these

    Jan 1, 2005

  • AUSIMM
    Theoretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas

    By Sharpin P. C

    The countercurrent gas-solid heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temperature distributi

    Jan 1, 1966

  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012

  • SME
    Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM

    By Wolfgang Gütter

    India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800

    Jan 1, 2005

  • SME
    Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage Prevention

    By Fritz Grübl

    Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.

    Jan 1, 2001

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • SAIMM
    Mining induced stress estimation for pillar extraction at shallow cover

    By A. K. Singh, R. Singh, P. K. Mandal

    On the basis of in situ study of pillar loading at different sites, an attempt is made in this paper to visualize the development of mining induced stress under varying geo-mining conditions. Field st

    Jan 1, 2003

  • AUSIMM
    Some Geological Investigations Into A Fossil River System in the Roof Strata of the Bulli Seam, Southern Coalfield, N.S.W.

    By Driver R. C, Moelle K. H R

    This paper is dedicated to the memory of our friend Peter McKenzie who contributed much to the knowledge of the New South Wales Coalfields.ABSTRACTA fossil river system was recently mapped over parts

    Jan 1, 1967

  • AUSIMM
    Road Haulage of Ore by Peko Mines N.L.

    With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla

    Jan 1, 1966

  • SAIMM
    Leaching of Copper Sulphides

    By Marko Lampi, Marc Nicolle, Janne Karonen, Kari Valkama

    "In the ten years from 2003 to 2013 global mine production of copper has increased by over 23% to meet demand while the weighted average head grade has dropped from 0.9 to 0.7% Cu. These divergent tre

    Jan 1, 2015

  • SME
    Tunnel Excavation Grand Coulee Third Power Plan

    By D. J. Duck

    INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos

    Jan 1, 1997

  • CIM
    Expert Systems Implementation at Peñoles Group Concentrators

    By Ramón Alanís, Filiberto Orrante, Andrea Festa, Baldomero Gutiérrez, Fernando Cornejo

    "SGS implemented two rules-based fuzzy logic expert applications on two grinding circuits operated by Peñoles Group in Mexico. Both expert systems are based on control strategies that push against pro

    Jan 1, 2009

  • SME
    Improving Secondary Grinding Capacity At The Empire Concentrator

    By H. Walqui, G. Rajala, G. Suardini

    The Empire mine began operations on 1963. Low grade Magnetite ore is processed to produce iron pellets for blast furnace feed. Three expansions were added to the original plant and several equipment u

    Jan 1, 2007

  • CIM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™

    By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown

    "Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r

    Jan 1, 2001

  • AUSIMM
    Microaerobic Microbial Manganese Dioxide Leaching

    By Madgwick J. C

    A novel, microaerobic, heterotrophic microbial leaching system for manganese dioxide is described. Mixed natural microflora were enriched by addition of sugars and crude plant nutrItIOnal supplements.

    Jan 1, 1983