Search Documents

  • AIME
  • AIME
    Low-carbon Steel

    By H. B. Pulsifer

    ONE of the most common basic open-hearth furnace products is a simple carbon steel with a carbon range from 0.05 to 0.15 per cent. The material is widely used for sheets, tubes, bars, wire and the inn

    Jan 1, 1931

  • SAIMM
    Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced Shotcrete

    Recently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate

    Jan 1, 2001

  • NIOSH
    OFR-82(2)-75 Probe Drill Guidance System - Volume 2 - Appendix A - Computer Program

    By Llewellyn A. Rubin

    ROUTINES AND SUBROUTINES A- 1 Wait Loop (Wait) A- 2 Receiver Processing (RCVP) A- 3 Control Panel Sequence (CPNL) A-4 Interrupt Routine (INTRP) A- 5 Math Processing Routine (PROC) A-6 Input

    Jan 1, 1973

  • TMS
    Green Recycling of EEE: Special and Precious Metal Recovery from EEE

    By C. E. M. Meskers

    Electronic and Electric Equipment contains a range of components made of a wide variation of metals, plastics and other substances. Up to 60 elements can be found in complex electronic equipment: base

    Jan 1, 2009

  • SME
    CART?: A Fundamental Tool For Process Circuit Design

    By A. Noble

    The design of separation circuits can be a complex, labor-intensive and costly process. While the engineer?s experience along with extensive data sets and simulation are crucial tools for determining

    Feb 27, 2013

  • CIM
    Diamond exploration targets, Michipicoten greenstone belt

    By A. C. Wilson

    "In 1991, local prospector C. “Mickey” Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Muse

    Jan 1, 2004

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • DFI
    Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - Introduction

    By Patrick E. Durnal

    The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across

    Jan 1, 1998

  • NIOSH
    MLA 7-83 - Mineral Investigation Of The Lost Creek Rare II Area (No. 5089), Shasta County, California ? Summary

    By Harry W. Campbell

    A Bureau of Mines investigation identified no mineral deposits in the Lost Creek RARE II area. Sand and gravel has been mined from alluvial flood plain deposits just outside the RARE II boundary. An o

    Jan 1, 1983

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SAIMM
    The Determination Of The Residual Strength Of Hard Rock Crush Pillars With A Width-To-Height Ratio Of 2:1

    By D. P. Roberts

    This paper reviews the use of crush pillars on mines in the Bushveld Complex and the Witwatersrand Supergroup. Stress measurements were undertaken in order to determine the residual strength of these

    Jan 1, 2005

  • AUSIMM
    Theoretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas

    By Sharpin P. C

    The countercurrent gas-solid heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temperature distributi

    Jan 1, 1966

  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012

  • SME
    Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM

    By Wolfgang Gütter

    India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800

    Jan 1, 2005

  • SME
    Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage Prevention

    By Fritz Grübl

    Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.

    Jan 1, 2001

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • SAIMM
    Mining induced stress estimation for pillar extraction at shallow cover

    By A. K. Singh, R. Singh, P. K. Mandal

    On the basis of in situ study of pillar loading at different sites, an attempt is made in this paper to visualize the development of mining induced stress under varying geo-mining conditions. Field st

    Jan 1, 2003