Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction EffectsBy Thomas L. Vandergrift
Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine
Jan 1, 2000
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian CoalfieldBy David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal MineBy Adrian L. Moodie
Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.
Jan 1, 2011
-
The Role of Gas Pressure in Coal BurstsBy Winton Gale
"Rock and coal fractures and micro seismic vibration are common occurrences during development mining. It is very uncommon for coal and rock to be propelled into the roadway during normal mining opera
Jan 1, 2018
-
Hydraulic Prestressing Units: An Innovation In Roof Support Technology (6dbf7428-5679-47b2-a60c-95193c59dbda)By Thomas Barczak
A new generation of hydraulic mine support prestressing devices has been developed. These thin-walled steel shells are machine-welded and can be inflated with water or any liquid to provide prestressi
Jan 1, 2004
-
Mining Under Rivers In Fuxin Coal MinesBy Liang Yin-Huai
In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.
Jan 1, 1990
-
Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt SystemBy John D. VandeKraats
Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su
Jan 1, 1998
-
The Integration Of Geology And Engineering In Ground Control And Mine Planning For A Multi-Level Underground Limestone QuarryBy D. Newman
An underground limestone quarry, developed in the 1940's, transitioned from a surface quarry to an underground room-and-pillar operation. The quarry expanded to a second underground level when th
Jan 1, 2001
-
The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal SeamBy Rodger Fry
All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an
Jan 1, 1984
-
Evaluation of Anchorage Integrity for Grouted Bolts in Weak StrataBy W. C. Smith
Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c
Jan 1, 1987
-
Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas
Jan 1, 2001
-
Strata Disturbance Prediction For Mining Beneath Surface Water And Waste ImpoundmentsBy Madan M. Singh
Mining under bodies of water such as oceans, lakes, rivers, streams, ponds, and other impoundments, is not a new technique. However, in the United States it has been fairly restricted to date. In orde
Jan 1, 1981
-
Evaluation of Rock Burst in Deep Coal Mining By Using the Forensic EngineeringBy Saeed Zhandi, Behdeen Oraee
"Rock bursts remain an important problem in longwall coal mining. These bursts are due to a sudden and severe failure of rocks from a high stress concentration in deep underground excavations that occ
Jan 1, 2015
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock MassBy Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
Laboratory Studies on Creep Behavior of Grouted Tensioned Rebar in Weak StrataBy Joseph Hirschi, Naga S. Y. Tirumalaraju, Aditya Mishra, Anthony (Sam) J. S. Spearing
"Primary roof support in underground coal mines in the USA consists mostly of fully grouted passive rebar or grouted (partially or fully) tensioned rebar. Research conducted at two room-and pillar coa
Jan 1, 2015
-
Eclipse Bolting SystemBy Alan Campoli
The Eclipse System was developed by Minova USA Inc. formerly Fosroc Inc. to improve the performance of 5/8-inch deformed rebar fully grouted into a one inch borehole. An 1/8-inch offset bolt head comb
Jan 1, 2003
-
Reformation Of The Hydraulic Stowing Mining Method (81b9f573-b6ec-447f-bbcd-728c29bd41c4)By Liang Yinhuai
The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover-caving and artificial mining method and the fully mechanized sublevel-caving minin
Jan 1, 1992
-
The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)By Thomas Barczak
Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to
Jan 1, 2002
-
Utilizing The ?Advance And Relieve? Method To Reduce Horizontal Stress Affects On The Mine Roof, A Case Study (b5b945af-699f-46b0-ae56-a98434baad9f)By Dennis R. Dolinar
A room and pillar coal operation in central Pennsylvania was experiencing roof cutters and long running roof falls caused by high horizontal stresses. The roof conditions created hazards for the miner
Jan 1, 2000
-
Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical ModelsBy R. Kaund
"Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m
Jan 1, 2018