Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With TechnologyBy Thomas W. McClain
This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac
Jan 1, 2001
-
Correlation Between The Effect Of Confining Pressure On Compressive Strength In Triaxial Tests And The Effect Of Diameter/Height Ratio On Compressive Strength In Unconfined Compression TestsBy Venkata S. Vutukuri
Compressive strength of cylindrical specimens of a model material and sandstone with various diameter/height (d/h) ratios was determined in unconfined compression tests. It was observed that the compr
Jan 1, 1993
-
Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of WeaknessBy Daniel W. H. Su
Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr
Jan 1, 1990
-
Method Of Selecting Suitable Types Of Powered Supports At Longwall FacesBy S. M. Hsiung
A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc
Jan 1, 1988
-
Massive Pillar Failure--Two Case StudiesBy David H. Tang
Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes
Jan 1, 1984
-
RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal MiningBy Thomas Rymer
Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa
Jan 1, 1988
-
Practical Aspects Of Longwall Pillar DesignBy Christopher Mark
The past decade has provided a wealth of practical experience with longwall pillar design. Design formulas developed specifically for longwalls have proven their value in numerous applications. Analyt
Jan 1, 1990
-
Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)By Ross W. Seedsman
The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume
Jan 1, 1992
-
Operational Experience With FLEXIBOLT Systems In Australian Coal MinesSince the initial development and trials of FLEXIBOLT flexible roof bolts, further comparative testing and product development has been completed as part of the changeover to this roof support system
Jan 1, 1994
-
A Model Of Shield-Strata Interaction And Its Implications For Active Shield Setting RequirementsBy Thomas M. Baraak
This paper evaluates factors which influence longwall support and strata interaction. The longwall system is composed of an immediate and main roof structure and three supporting foundations: 1) longw
Jan 1, 1990
-
Longwall Mining Of Thin SeamsBy Ernest A. Curth
An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv
Jan 1, 1981
-
A New Method For Longwall Pillar DesignBy P. Tsang
In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed
Jan 1, 1993
-
Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal MineBy Y. P. Chugh
About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for
Jan 1, 2004
-
Subsidence Monitoring Results, Thick Seam Longwall Mining In WyomingBy Collin L. Stewart
A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog
Jan 1, 1995
-
Roof Control and Roadway Support Design in the #9 Coal Seam, Wuhushan Coal Mine, ChinaBy Yundong Ma
In this paper the dynamic process of rock deformation and failure in the roadways of the #9 coal seam, Wuhushan Coal Mine by was simulated using the software "Rock Failure Process Analysis System (REP
Jan 1, 2005
-
Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)By Sun Henghu
This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn
Jan 1, 1992
-
Mechanisms of Rib Sloughing and Methods of Controlling Thick Bolted RibsBy Shuangsuo Yang
Coal ribs can roughly be divided into three types: (1) roof and floor rocks are similar to ribs, (2) roof and floor rocks are stronger than ribs, and (3) roof and floor rocks are weaker than ribs. Dif
Jan 1, 2005
-
Time Dependent Strength Of Coal Strata For Long-Term Pillar StabilityBy Z. T. Bieniawski
A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest
Jan 1, 1994
-
Machine Design Parameters For High Seam Truss Bolting ApplicationsBy G. Bucelluni
An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar
Jan 1, 1982
-
New Approach to Evaluate the Stability of Yield PillarsBy Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003