Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    Sublevel Caving Mining Method for Extra-Thick Coal Seams

    By H. Nan

    Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full

    Jan 1, 2006

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Presented at the 25th International Conference on Ground Control in Mining

    By David Dye

    Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou

    Jan 1, 2007

  • SME-ICGCM
    Surface Subsidence Caused By Flooding and Dewatering at Four Abandoned Coalmines in the US

    By Kewal K. Kohli, Stefanie Self

    "Three cases of surface subsidence investigated over abandoned coal mines after flooding in one case and dcwatering in two cases are presented in this paper. Mining was conducted by the room and- pill

    Jan 1, 2010

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    Time–Lapse Photogrammetric Monitoring of an Underground Stone Mine

    By Brent A. Slaker, Michael Murphy, John Ellenberger, Erik Westman

    "Photogrammetry, as a tool for monitoring underground mine deformation, is an alternative to traditional point measurement devices, and may be capable of accurate measurements in situations where tech

    Jan 1, 2015

  • SME-ICGCM
    Field Measurements of Overburden and Chain Pillar Response to Longwall Mining

    By Daniel W. H. Su

    Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main

    Jan 1, 1987

  • SME-ICGCM
    Analysis of Monitored Ground Support and Rock Mass Response in a Longwall Tailgate Entry

    By B. Tulu, D. Gearhart

    A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a

    Jan 1, 2017

  • SME-ICGCM
    Application of Phenolic Foam in Longwall Mining

    By Marc Arl

    Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro

    Jan 1, 2005

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    A Pipeliner's Perspective on Longwall Mining

    By Robert B. Francini

    Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.

    Jan 1, 2011

  • SME-ICGCM
    Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story

    By Michael Gauna, Christopher Mark

    "For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like

    Jan 1, 2016

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    Design of Roof Bolt Based Breaker Line Support in a Mechanised Depillaring Panel

    By Sahendra Ram, Arnn Kr Singh, Dheeraj Kumar, Rajendra Singh

    "Inherent existence of different rooms (openings) along the extraction line in a depillaring panel provides an easy path for the goaf to encroach the working area. Each of these openings in a mechaniz

    Jan 1, 2016

  • SME-ICGCM
    Mining Effects on Gas and Oil Wells Pad NV-35 Field Experiment Field Monitoring

    By Vincent A. Scovazzo

    "The most significant study on the effects of longwall mining on gas and oil well integrity was completed by a consortium of coal and shale gas industry participants. A field study was conducted in 20

    Jan 1, 2018