Sub-Surface Ground Movements Associated With Longwall MiningBy P. Gaskell
The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics
Jan 1, 1988
-
Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?By Wouter Hartman
Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int
Jan 1, 2012
-
Developments of a Prototype Borehole Profilometer to Estimate Roof-Bolt Anchorage Capacity from Borehole Roughness Measurements-Laboratory TestsBy Mark K. Larson
Researchers at the National Institute for Occupational Safety and Health?s (NIOSH) Spokane Research Laboratory are developing a borehole profilometer to dynamically measure the roughness pro-file of b
Jan 1, 2007
-
A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West VirginiaBy R. B. Alke
Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o
Jan 1, 1984
-
Pillar Strength and Design Methodology for Stone MinesBy Gabriel Esterhuizen
Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd
Jan 1, 2008
-
The Origin and History of U.S. Mine ResinBy Carl Tom Blevins
Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti
Jan 1, 2006
-
Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal MinesBy Michael Bayerl
The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh
Jan 1, 2009
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Subsidence Control Over Abandoned MinesBy Victor V. Nazimko
Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for
Jan 1, 1996
-
An Overview Of The National Roof Evaluation Accident Prevention (REAP) ProgramBy J. M. Krese
This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac
Jan 1, 1988
-
Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting ResearchBy Jiulong Cheng
Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep
Jan 1, 2006
-
Comparison among the Conventional Fully-Grouted Bolt, Combination Bolt, and One-Step Bolt Using Numerical ModelingBy Andre Zingano
The objective of this paper is to compare the behaviors of different types of roof bolts: (1) One-Step Bolt (OSB), (2) Fully grouted Bolt (RB), (3) Combination Bolt (CB), and (4) Torque tension Bolt
Jan 1, 2007
-
Characterization of Internal Insertion Pressure During Installation of Fully Grouted BoltsBy Luis Giraldo
The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that
Jan 1, 2006
-
Continuous Improvement In Cuttable Coal Rib Support In Australian Coal MinesBy Ghassan Skybey
Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages
Jan 1, 1995
-
Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical ModelingBy Dennis Dolinar
In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a
Jan 1, 2007
-
Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case StudiesBy John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal MinesBy K. H. Brandt
A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie
Jan 1, 2004
-
A Simple Method Of Measuring Rock Fracture Toughness Using The Brazilian Test MethodBy H. Guo
There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chevron -
Jan 1, 1992
-
An Applications Approach To Barrier Pillar Design For Improved Resource RecoveryBy John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989
-
Mine Pillar Stability Analysis Using Fem Methods - Two Case StudiesBy David H. Tang
Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite
Jan 1, 1990