Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use Of Low-Toxic Heavy Suspensions In Mineral Sands Evaluation And Zircon FractionationBy Stafford McKnight, Larissa Koroznikova, Steve Hall, Cameron Klutke
This paper outlines a simple methodology for mineral characterisation, developed as part of the Australian Mineral Industry Research Association (AMIRA) managed research project P777 ?The Development
Jan 1, 2007
-
Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System - Synopsis (0b7ce52d-2bd9-4f5e-84a7-9ce2b2e08562)By M. Le Roux
Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli
Jan 1, 2012
-
Benefits Of Increased Flotation Cell Size - A Pyrite Flotation Plant Case Study - SynopsisBy C. Wade, A. Swart, M. Dworzanowski
AngloGold Ashanti operate a pyrite flotation plant at their East Gold Plant, Acid Plant and Flotation Plant (EGAF) metallurgical complex within their Vaal River operations in the North West province i
Jan 1, 2007
-
Investigation of physical and mechanical properties of polymer based composite material using volcanic tuff dust in Cappadocia, TurkeyBy I. Çinar
Cappadocia is not only a region of Turkey with historical and touristic importance. During the cutting and processing of volcanic tuff, quarries in this region release large amounts of tuff into the e
Mar 5, 2025
-
Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System ? SynopsisBy M. Le Roux
Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli
Jan 1, 2012
-
Project control - an overviewBy E. R. Davis, R. J. Knott
The paper discusses some of the tools of management in the field of project control, especially in engineering. Project control includes planning and cost engineering, and involves various phases: the
Jan 1, 1982
-
Characterization and distribution of chrome spinel grains in magnetically fractionated ilmenite concentratesThe distribution of chrome spinels in a magnetically fractionated ilmenite concentrate sourced from the Murray Basin was characterized by XRF assaying, quantitative electron microprobeanalysis, grain
Jan 1, 2003
-
An Improved Dc-Arc Process For Chromite SmeltingBy J. P. W. Bennie, A. de Jong, G. M. Denton
Mintek together with Middelburg Steel & Alloys, developed the DC arc furnace process for the production of ferroalloys with the expressed objective of smelting ore fines (<1mm) without the need for ag
Jan 1, 2004
-
Instrumentation And Automation Systems On Performance Of Ferro-Alloys PlantsBy Swapan Ghosh, Amitava Sengupta, Proloy Das
Ferro-alloys are very important ingredients used for making of quality steel with desired composition. In view of high demand in various types of ferro-alloys, it has become necessary to produce the s
Jan 1, 2007
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? SynopsisBy T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Integrated Optimization Of Underground Mine Design And SchedulingBy J. Little
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput
Oct 1, 2013
-
1.2 McWha - Manufacture And Use Of Reference MaterialsBy Mike McWha
Drivers to increasing RM use ?Compliance issues ?Section 12 JSE Listing Rules ?Canadian NI 43-101 ?Sarbanes Oxley ?Shortage of African ore reference materials ?Poor perceptions about quality
Jan 1, 2005
-
Annual General Meeting of the InstituteThe Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 24th August, 1977. Dr M. D. G. Salamon (President) was in the chair and dec
Jan 1, 1978
-
Laboratory simulation of the behaviour of highly stressed mining frontsBy M. C. Bétournay
Strainbursts are common in overstressed brittle rock around deep mine openings. Such failures are characterized by a biaxial state of stress in the plane of the opening boundary. A zone of compressi
Jan 1, 2003
-
Morphological approach to volume calculation of complex 3D geological objectsBy D. R. Hack, N. M. Sirakov, M. L. Feves, M. Iwanowski
This paper presents a new approach capable of volume calculation of 3D reconstructed geological objects. The method is based on a well-known concept that states the volume of an object can be computed
Jan 1, 2003
-
Laser Surface Melting Of 304 Stainless Steel For Pitting Corrosion Resistance ImprovementBy T. S. Seleka
Laser surface melting has been conducted on a 304 stainless steel (SS) with the aim of enhancing pitting corrosion resistance of the material. This process involves rapid melting of the material?s sur
Jan 1, 2007
-
Kinetic Studies On The Leaching Reactions In The Autoclave Circuit Of The Tati Hydrometallurgical Demonstration PlantBy B. D. Paphane
Since the commissioning of the Tati Hydrometallurgical Demonstration Plant (HDP), which produces Ni and Cu cathodes as well as Co salt from sulphide concentrate employing Activox® technology for leach
Jun 1, 2013
-
Sensitivity Analysis Of A Dynamic Model For Submerged Arc Silicon FurnacesBy B. E. Ydstie, B. F. Lund, K. R. Løvåsen, B. A. Foss
The paper presents sensitivity analysis for a dynamic model of submerged arc silicon furnaces. The model we study, called ?Simod?, was developed by Elkem in cooperation with NTNU and Sintef. It is tod
Jan 1, 2004
-
A New Bubble Pick-up Technique as a Rapid Flotation Test MethodBy A. F. Lee
A pick-up apparatus capable of yielding quantitative results has been described. Studies of some collector-mineral systems have been presented to illustrate the versatility of the apparatus and prove
-
Systems simulation for dragline selection in open cast minesBy K. M. Li, Y. D. Zhang
The selection of stripping dragline is a complicated problem. Several factors, such as the deposit buried conditions, the demand of mine production rate, cast blasting result, the mining/stripping ope
Jan 1, 2003