Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 4114 Virginia Marl Deposit, New Kent Co., VABy R. C. Hickman
"INTRODUCTION Marl, consisting of a bed of coarse shell conglomerate from 1 to 5 feet thick, occurs on the Chesapeake Corporation tract and Philbates properties in New Kent County, Va.Nine holes were
Aug 1, 1947
-
RI 9167 - Na2Cr04 From Domestic Chromite Concentrates by an Alkali-Fusion MethodBy G. L. Hundley
The Bureau of Mines has devised a procedure to recover chromium chemicals from concentrates derived from low-grade domestic chromites. These domestic chromites contain silicon and aluminum impurities
Jan 1, 1988
-
RI 8165 Fluidized Coke-Bed Chlorination of IlmenitesBy H. M. Harris
The Bureau of Mines investigated chlorination of domestic ilmenites in a fluidized coke bed at temperatures of 950° to 1,150° C. Objectives were to develop an effective process for producing TiC14 sui
Jan 1, 1976
-
IC 6769 Manganese Its Occurrence, Milling, and Metallurgy. Part IIBy C. G. Maier
The present trend of chemicometallurgical research toward widespread and inclusive use of thermodynamic methods requires the inclusion of available data of this sort in any comprehensive metallurgical
May 1, 1934
-
RI 3392 Résumé Of Problems Relating To Edgewater Encroachment In Oil Sands (de729ca5-9456-4526-8a3c-75575a49c977)By F. G. Miller
[Petroleum technoloF;istz and 1 rot-re s s ive OT e:?ztors. con stantl;, are striving to increase the percentage of oil that y to recovered from reservoir rocks throe::;:: wells. The exhaustive studie
Jan 1, 1938
-
RI 6649 A Study Of The Chlorination Kinetics Of Germanium, Silicon, Iron, Tungsten, Molybdenum, Columbium, And TantalumBy Arne Landsberg
A study of the chlorination kinetics of germanium, silicon, iron, tungsten, molybdenum, columbium, and tantalum has been made to determine the effects of temperature, chlorine concentration, geometric
Jan 1, 1965
-
RI 3528 Stemming In Metal Mines - Progress Report 2 ? Introduction (4f63a799-a1a0-41e4-aa04-0692e1f4d9b5)By John A. Johnson
The first report of investigations5/ in this series pertaining to the investigation of stemming at the Mount Weather testing adit dealt with dust produced from blasting. The present report discussed t
Jan 1, 1940
-
RI 3528 Stemming In Metal Mines - Progress Report 2 ? IntroductionBy John A. Johnson
The first report of investigations5/ in this series pertaining to the investigation of stemming at the Mount Weather testing adit dealt with dust produced from blasting. The present report discusses t
Jan 1, 1940
-
RI 6905 Reactions Of Manganese With SilicaBy H. G. Iverson
Solid state reactions of manganese with silica were investigated in high-temperature tests. Reactions of 0.5 to 4.0 moles manganese (Mn) with 1 mole silica (SiO2) at 1,100° C and of 2.0 Mn:SiO2 mole-r
Jan 1, 1967
-
RI 8340 Autoclave Leaching of Copper-Nickel Matte Produced From Duluth GabbroBy L. A. Haas
The U.S. Department of the Interior, Bureau of Mines, is conducting laboratory-scale research to determine the leaching conditions required with sulfuric acid for extracting base metal from a matte wi
Jan 1, 1979
-
IC 8512 Mesabi Range Iron Ore Transportation - Feasibility And Estimated Cost Of PipeliningBy Harold J. Polta
This Bureau of Mines publication considers the feasibility of augmenting the present transportation system by pipelining taconite concentrates from the Mesabi Range to the Chicago area. The cost o
Jan 1, 1971
-
World Economy - IntroductionBy Charles L. Kimbell
In overview, 1988 appeared to be the best year for the world's mineral industry since 1980, although the all-important petroleum component suffered severely from low prices. With this notable exc
Jan 1, 1990
-
Surface Characterization for Coal ProcessingBy R. Hogg, S. Chander
"INTRODUCTION The behavior of particulate systems in general is determined by the properties of the solid and fluid phases and of the interfaces between them. As particle size is reduced, the inter fa
Jan 1, 1989
-
OFR-109-77 Noise Reduction Of Conveyors Used In Underground Coal Mining MachineryBy Geoffrey G. Huggins
Discussions are presented of the three phases of the noise reduction program on flight-type coal conveyors. The three phases are identification of noise sources, evaluation of potential noise reductio
Jan 1, 1976
-
IC 7481 Methods of Producing Ultra-Clean Coal for Electrode Carbon in GermanyBy L. D. Schmidt, H. G. Graham
Several processes for the production of ultra-clean coal for electrode carbon were developed in Germany prior to and during World War II . These processes have been investigated since the end of the w
Oct 1, 1948
-
IC 8527 Control Of Sulfur Oxide Emissions In Copper, Lead, And Zinc SmeltingAir pollution control regulation$ already implemented or being considered for implementation require substantial investment of capital to remove the sulfur oxides from copper, lead, and zinc smelter g
Jan 1, 1971
-
RI 6116 Vibration Damping Capacity Of Various Magnesium AlloysBy D. F. Walsh
A study of damping capacity was made on a number of magnesium-base alloys, commercial types and experimental compositions. Hardness and tensile properties were determined, and the microstructure of ea
Jan 1, 1962
-
RI 3448 Classification and Tabling of Table Middlings at the Colta Coal Washery, Flat Creek, Ala.By H. J. Hager, B. W. Gandrud, G. D. Coe
"INTRODUCTION The reduction of washery losses of marketable coal is a phase of coal preparation important to many of the Alabama coal producers. The problem has wide scope, and this report deals with
May 1, 1939
-
RI 5744 Carbonizing Tests With Tuscaloosa Oven: Factors Influencing Apparent Specific Gravity ? Introduction And SummaryBy J. B. Gayle
During the past several decades, there has been a steady increase in the number and size of experimental ovens used for carbonization research. Although many were originally intended principally for s
Jan 1, 1961
-
OFR-76(5)-75 Mine Electrical Systems Evaluation - Model Coal Mine Electrical System Specifications - IntroductionBy Lloyd A. Morley
Previous research conducted for the USBM by Penn State personnel (Grant GO-101729) found that a need existed to physically model a typical a-c/d-c coal mine section electrical system. Its purpose woul
Jan 1, 1974