Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Difficulties and Suggestions when Drilling and Blasting in a Karst EnvironmentBy James T. Ludwiczak
Drilling and blasting in a Karst (sinkholes and mud seams) environment has long been a problem for blasters, miners, quarry operators, contractors, and developers. While one cannot change the geologic
Jan 1, 2005
-
GEM (Geologic Element Motion) Blast Heave Modeling Sensitivity Studies of Explosive Formulations and Energy PartitioningBy D. S. Preece, S. Silling, A. Bhuiyan, C. M. Lownds
GEM (Geologic Element Motion) is a Discrete Element Method (DEM) capability for blast-induced heave simulation with a very fast computational algorithm that can efficiently treat many different elemen
Jan 1, 2024
-
Powder Factor Analysis of Quarry Blasts Through the Fragmentation-Energy Fan ConceptBy Ian Bell
This paper investigates fragmentation in an aggregate quarry using the fragmentation-energy fan concept. Six blasts were monitored, located one behind the other in the same quarry area. The rock struc
Jan 1, 2019
-
Improved Blasting Economics at an Uzbekistan Copper MineBy Viktor Aranovich, Thomas E. Brown
The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn
Jan 1, 1998
-
Construction Blasting in Central OregonBy Paul Schmiesing, Matt Higgins
Central Oregon is a fast growing resort community centered in Bend, Oregon. Bend is bordered by the Cascade Mountains to the west and the high dessert to the east. Central Oregon is blanketed with lav
Jan 1, 2000
-
Regulatory Review of Blasting Related Citizen ComplaintsBy Kenneth Eltschlager
The Surface Mining Control and Reclamation Act of 1977 requires that blasting be conducted so as to prevent injury to people and damage to public or private property. The three adverse effects are fly
Jan 1, 2001
-
Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog MineBy Norman Paley
A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput
Jan 1, 2012
-
Application of blast control plugs and their positive results on airblast and surface fragmentationBy Lynn Long
We have seen many new developments in the explosive and blasting accessory category, but one of the most useful items is the blast control plug. Blast control plugs are cone shaped units that are plac
Jan 1, 1996
-
A Blasting Agent Having Unusually Low Velocity and Producing Unusually Low Ground Vibration and Large Burden DisplacementBy D Linn Coursen
Detonation propagates in the subject blasting agent at about 2.7 km/sec when it is heavily primed but explosion propagates in it at only about 0.43 km/sec when it is lightly primed. When propagating a
Jan 1, 1994
-
Integration of Mine Resources in the Optimization of Shot DocumentationBy Kyle Apple
The following is a case study of how LuckStone Corporation improved their blast monitoring and documentation program. A number of resources already at their disposal have been utilized to improve the
Jan 1, 2001
-
Low Cost Raw Materials for Emulsion Explosives ApplicationsBy John Manka
Emulsion explosives consist of an aqueous oxidizer phase, a fuel phase, and an emulsifier. The ability to use lower-cost sources for any of these raw materials presents an obvious economic advantage t
Jan 1, 2003
-
Development and Field-Test of Low Density ANFOBy S. Nakamura, H. Taniguchi, K. Noguchi, H. Sugihara, T. Matsuzawa
It has been reported that expanded poIystyrene and ANFO prills ‘were mixed on a blasting site for controlled blasting (ISANOL). Although there seems to be few possibility of their segregation because
Jan 1, 2001
-
Dust Control in Surface MinesBy John W. Brown
"Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper
Jan 1, 1999
-
Reducing Blasting Costs using Air-Decks: The Do's and Don'tsBy S B. Richardson, D Mead, N T. Moxon
The use of air-decks to reduce explosive costs has become very topical in recent years. The majority of the research in this area has been arried out between the Soviet Union where reductions in explo
Jan 1, 1991
-
Increasing El Toro Mining Productivity through the Application of Massive Blasting Techniques while Reducing Environmental Impact on Neighboring CommunitiesBy César Ugaz Castañeda, Paulo Fernández Alvarado, Richard Sotomayor Oblitas, Rocke Enríquez
Mina El toro has been making substantial changes in its operation to improve its social impact and productivity. Because of the use of gasified emulsions and electronic initiation system, it was possi
Feb 1, 2020
-
Near-Field Vibration MonitoringBy R Yang, P D. Katsabanis, W F. Bawden
Understanding the mechanisms which are taking place during the propagation of a stress wave generated by an explosive charge is of high importance in the detection, characterization and prediction of
Jan 1, 1993
-
Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown HelsinkiBy R Vuolio, B A. Jonsson
In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl
Jan 1, 1985
-
Unexpected Explosions in Blasting Practice and Their PreventionBy Xu Tianrui, Jin Xiang, Pen Dianhua
Based on the results of research or investigation, this paper describes the causes of and countermeasures for unexpected accidents, such as premature, postponed or spontaneous explosions in blasting p
Jan 1, 1996
-
Estimation of Critical Distances to Avoid Failures in Detonators by Dynamic Pressure.By Lizbeth A. Escobar, Phol M. Llanos, Maritza Y. Avila
The present research develops the estimation of critical parameters such as the distances and times between holes to avoid failure due to dynamic pressure in electronic detonators based on the near-fi
Feb 1, 2020
-
Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse MemorialBy Jeff Hermanson
Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been
Jan 1, 1996