Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Field Testing of Aluminum Mesh for Blast Mitigation Properties

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    Despite its porous and lightweight characteristics, aluminum mesh is believed to have blast mitigation properties. The current use of the mesh includes fuel tanks for airplanes, boats, and fuel statio

    Jan 1, 2009

  • ISEE
    Ground Vibration Attenuation Rate due to Blasting in South Florida

    By Sharkey Bowers

    This study was undertaken in order to determine a conservative estimate of the attenuation rate of vibrations through the shallow limestone in South Florida due quarry blasting. The natural limestone

  • ISEE
    Potential Applications of Ultra High Intensity Blasting, UHIB

    By Egonk Arriagada, Jair Alarcon

    The efficient use of energy in the ore comminution process is an increasingly important strategic issue for improving the productivity and competitiveness in the mining industry as is in recent years

    Jan 1, 2015

  • ISEE
    Industry Task Force for Elimination of Blasting-Based Flyrock Incidents Update

    By Braden T. Lusk, Brett C. Jackson

    The Kentucky Commissioner of the Department for Natural Resources, accompanied by a motion for accident prevention from Kentucky’s Explosive Industry and other associated fields, have requested for an

    Jan 1, 2014

  • ISEE
    Optimal Delay Periods and Complex Timing Sequences Using Electronic Delay Detonators

    By Y. Idrogo

    Electronic delay detonators have been used in most types of blasting application with great success, with the accuracy and precision being used effectively to control negative environmental impacts li

    Jan 1, 2018

  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • ISEE
    Drilling on the Taum Sauk Upper Reservoir Rebuild Project

    By Randall Head

    The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp

    Jan 1, 2010

  • ISEE
    New Technologies in Electronic Blasting For Enhanced Safety and Productivity

    By Raphael Trousselle, William Reisz

    The blasting industry is now well into its second decade of commercial use of electronic detonators. As an increasing number of blasters are introduced to the technology, the benefits are becoming mor

    Jan 1, 2012

  • ISEE
    Risk-based Explosives Safety Assessment In Switzerland And Europe

    By Andreas Bienz

    The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor

    Jan 1, 2007

  • ISEE
    Shaping the Panama Canal by Blasting – Pacific Complex’s Works

    By Paulo Couceiro, Manuel Lopez Cano

    "The Panama Canal is one of the most important engineering projects of the modern era and plays astrategic role in the global economy and international maritime trade since its inauguration in 1914. N

    Jan 1, 2017

  • ISEE
    Rock Removal Techniques and Equipment in Trench Excavation and Pipeline Construction. A Comparison

    By Benedict C. Di Duca

    In the underground construction industry. when bidding work, not only is the contractor faced with determining if rock: is in existence within the parameters of his work. he must also estimate the qua

    Jan 1, 1990

  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    A Study on the Correlation Between Delay Time and Fragmentation

    By Yeon-Ho Jin, Eui-Haeng Heo, Yun-Seok Park, Sung-Oong Choi, Hyung-Dong Min, Min-Su Jeong, Seung-Joong Lee

    As rock fragmentation in bench blasting can affect the following process such as loading, hauling and crushing, its good control is essential for assessment of blasting efficiency and production cost.

    Jan 1, 2015

  • ISEE
    The Use of Large Diameter Blastholes Underground at Meramec Mining Company

    By James C. Irvine

    Meramec Mining Company's Pea Ridge underground mine is presently involved in a large scale pillar recovery program and has made use of both rotary and down-the-hole drills for large diameter blasthole

    Jan 1, 1976

  • ISEE
    Explosive-Driven Power Generation Research at the University of Missouri-Rolla

    By P. N. Worsey, M. Schmidt

    Many advanced military systems and civilian power generation concepts postulate the availability of compact sources of electrical power capable of delivering gigawatts over microsecond time scales. Fo

    Jan 1, 2000

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Unlocking the Wealth From Benefit Sharing in Drill and Blast

    By Lawrie Logan, Mike Wiggin

    This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen

    Jan 1, 2001

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Hydraulic Boulder Fragmentation using Small Explosive Charges (e17fa3e4-a011-4982-aee2-a189f0d0465a)

    By Bryan J. Lane, Paul N. Worsey

    The recommended maximum explosive weight for boulder blasting using internal charges is 0.1 O-kg/m” (3.5 oz./yd) (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, cre

    Jan 1, 1999