Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Render-Safe Operations in an Urban Environment

    By Robert McClure, Carlton Lehman

    Rendering safe explosives in an urban environment presents a unique challenge due to the safety concerns and disruption to the general public. Potential damage to the surrounding homes, businesses, ut

  • ISEE
    Influence of Rock Mass Properties on Blast-Induced Rock Movement

    By Behrouz Ohadi, Kamran Esmaeili, Bibhu Mohanty

    In most metalliferrous open pit mines with heterogeneous orebodies, blast-induced rock movement is a crucial outcome that has unfavorable impact on ore and waste segregation in the post-blast muck pil

    Jan 1, 2018

  • ISEE
    Investigation of Cautious Blasting Model Applied During Tunneling of Kadikoy-Kartal Subway Construction

    By Ali Kahriman, Olivio Angelini, Ibrahim Sefer, Burak Ekmen, Koray Arpak, Ertugrul Kaya, Yucel Karakus, Abdullah Sak, Aziz Ozdemir

    In recent years, in order to bring solution to traffic intensity arising from transportation problems and facilitate public transportation in the modern world in paralel to urbanization and to the inc

    Jan 1, 2010

  • ISEE
    Render-Safe Operations in an Urban Environment

    By Robert McClure, Carlton Lehman

    Rendering safe explosives in an urban environment presents a unique challenge due to the safety concerns and disruption to the general public. Potential damage to the surrounding homes, businesses, ut

    Feb 1, 2020

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • ISEE
    Better Fragmentation Through Team work At Dos Pobres Mine Safford, Arizona

    By Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of

    Jan 1, 2010

  • ISEE
    Harmonic Delamination of Nuclear Structures

    By Frederick B. Kuhnow

    Harmonic energetic delamination a building is being considered for demolition at a formerly known atomic power lab. The building is within a containment structure under a negative pressure, so that no

    Feb 1, 2020

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    Explosives Safety and Security

    By Joseph A. Meyers

    NYC has always been a high-profile target for both foreign and domestic terrorists. Explosives have always been the go-to tool for terrorists to bring about serious physical injury, death, and propert

    Jan 21, 2025

  • ISEE
    Microseconds Matter in Monitoring

    By Gregory B. Poole

    Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on

    Feb 1, 2020

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Pre-Controlling Blast Site Safety to Ensure Profitability

    By S. J. Dillingham

    One of the primary goals of every blaster is to achieve the optimum blast design. Too much focus on efficient design, however, can cloud certain issues and exposures that must be addressed if the enti

    Jan 1, 2002

  • ISEE
    Explosives Safety is a New Ball Games

    By Joe Dannenberg

    One must be cautious in talking about blasting safety, because the very act of making a blast involves the creation of an infernal machine. You are setting up for the instant release of tremendous ene

    Jan 1, 1975

  • ISEE
    Blast Vibration Analysis from Signature Holes

    By Nikolaos Petropoulos, Ulf Nyberg, Daniel Johansson

    A series of signature boreholes were blasted to observe any difference between confined and free face blasts. Four geophones were used to capture the compressive wave. The conventional approach, i.e.

    Feb 1, 2020

  • ISEE
    Journal: Safety Talk / Lightning Is Still Lightning

    By Wiliam Reisz

    As we approach the peak season for thunderstorm activity it’s important to keep in mind that lightning still poses a serious threat to drilling and blasting operations. Lightning remains the number on

    Jan 1, 2008

  • ISEE
    Hospital Buildings: A Construction Site Surrounded by Them

    By John Wright

    As part of the redevelopment of the Royal Brisbane Hospital complex in Australia, a number of antiquated buildings were to be demolished and replaced by newer, modem facilities. Aside from the decommi

    Jan 1, 2000

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    World's Longest Highway-Tunnel Tests 'Site Sensitized Emulsion'

    By Bjoern R. Petterson, Lars Haakon Siem

    The world's longest highway-tunnel -- the Aurland Tunnel in western Norway -- is scheduled to be opened in the year 2000. A project to build a main highway between Oslo and Bergen with no ferry connec

    Jan 1, 1996

  • ISEE
    The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance Intervals

    By Perry Sisk

    In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla

    Jan 1, 2013

  • ISEE
    Mitigation Research of Covering Marine-bottom Ordnance

    By Gregory Hempen, Thomas Keevin, Russell Wilcox, William Wild

    The Department of Defense Strategic Environmental Research & Development Program (SERDP) awarded funding for evaluation of procedures to mitigate peak pressures and energy flux density in the water co

    Jan 1, 2011