Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When DeckingBy Neal Lee, Braden T. Lusk, Brendan McCray
Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp
Jan 1, 2016
-
Quarry Blast Permitting in the Urban EnvironmentBy Chris Breeds, Ken Johnston, Omar Fulton
This paper describes the process typically involved with obtaining permits for quarry blasting in urban, suburban, and rural areas, including: content of SEPA (State Environmental Policy Act) driven d
Jan 1, 2003
-
Determination of Air Blast Overpressure LevelsBy Karl E. Burgher
Since World War II, the need for the use of explosives with testing, construction, demolition, mining and quarrying near urban areas has increased dramatically. Once remote, testing areas have been en
Jan 1, 1988
-
Blasting Induced Rock Fragmentation Prediction Using the RHT Constitutive Model for Brittle MaterialsBy Dale Preece, Stephen Chung
Blasting induced rock fragmentation is an art that has been developed and refined for hundred’s of years through blasting and recording the results. Good blasting fragmentation practices were thus dev
Jan 1, 2003
-
Trench Blasting in Close Proximity to Existing Utilities in Ultra Metamorphic RockBy Tom Treleaven, Andrew Williams
The town of Greenwich, CT, an exclusive suburb of New York City awarded several contracts for the installation of sanitary sewer in the North Mianus section of town. The Valley Road section was the mo
Jan 1, 2004
-
Evaluation of Ground Vibration Induced by Blasting During the Excavation of a Transportation Tunnel in Istanbul MetropolisBy Ali Kahriman, Abdulkadir Karadogan, Deniz Adiquzel, Umit Ozer, Suat Bicer, Mehmet Aksoy
This paper presents the analysis and measurements of blast-induced ground vibrations during the construction of Istanbul Kagithane – Piyalepasa – Dolapdere – Dolmabahçe highway tunnels. These tunnels
Jan 1, 2008
-
Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site ManagerBy Steve Dillingham
Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m
Jan 1, 2001
-
Modeling Ground Motion in 3D Geologic Media from Fragmentation Explosions: Preliminary ResultsBy Donald Thompson, Jessie Bonner, Ileana Tibuleac
Predicting ground motion from complicated mining explosions is important for mines developing blasting programs in regions where vibrations must be kept below certain levels. Additionally, predicting
Jan 1, 2005
-
Concrete Bridge Pier Removal in an Environmentally Sensitive RiverBy Paul Kunze
When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.
Jan 1, 2014
-
Deformation of An Explosively Driven Flat Metallic Flyer During ProjectionBy Seokbin Lim
In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an
Jan 1, 2010
-
New Blasting Techniques to Eliminate Subgrade Drilling, Improve Fragmentation, Reduce Explosive Consumption and Lower Ground VibrationsBy R. Frank Chiappetta
A new blasting technique has been developed by International Technologies, LLC. to eliminate subgrade drilling, lower ground vibrations, improve fragmentation and reduce explosive consumption. The new
Jan 1, 2004
-
Applied to a High Risk Case HistoryBy C Agreda
The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di
Jan 1, 2005
-
Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography SystemsBy Bruce Vandenberg, R. Frank Chiappetta, John Foley
Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of
Jan 1, 2000
-
Small Scale Testing to Investigate Air Blast Loading on PlatesBy H Ulrich Leiste, Leslie Talor
This paper describes a series of small scale tests conducted to investigate the loading applied to a flat plate by the detonation of a cylindrical charge very close (between two and three charge radii
Jan 1, 2009
-
Blast Designs and Instant Diagnostics Using the SVC1000 Digital, High-Speed Smart Video Camera SystemBy Bruce Vandenberg, Andy Bartfay-Szabo, Steve Conway
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 500 frames per second. Up to 8 seconds of data can b
Jan 1, 1995
-
Using State of the Art Blast Modeling Software to Assist the Excavation of the Yucca Mountain Nuclear Waste RepositoryBy Jason Ryan, Stephen Harria
Q.E.D. (QED) is a blast design and evaluation model that allows full three-dimensional design specification including the development of unique “live” terrains and an unlimited variety of complex char
Jan 1, 2000
-
Journal: Big Sky and Beyond Explosives, Avalanches and RegulationsBy Mike Boissonneault
It was three years ago when the “storm of the century” had taken a firm grip over the Pacific West Coast and inland areas. At the Big Sky ski resort in Montana on Christmas morning two ski patrollers
Jan 1, 2001
-
Journal: Junction Chamber Blasting November 22,1999By Edward Walter
Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m
Jan 1, 2001
-
The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines LimitedBy Sam Kangwa, Thomson Sinkala
In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese
Jan 1, 2004
-
High-wall Control at Anglo Gold Ashanti, Navachab MineBy Charles Pretorius, Henk Ludik
Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting
Jan 1, 2006