Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The komis gold deposit and ep zone waddy lake area, saskatchewan

    By Brian C. Asbury

    Gold-bearing quartz veins with auriferou pyritic wall rock alteration haloes at the Komis deposit near Waddy Lake in northern Saskatchewan occur in fractured Archean intermediate volcanic rock flankin

    Jan 1, 1986

  • CIM
    Certain Operating Phases in the Refining of Copper at the Ontario Refining Co., Ltd.

    By Frederic Benard

    THE Ontario Refining Company, Limited, wholly-owned subsidiary of The International Nickel Company of Canada, refines the entire blister copper output of the latter's Copper Cliff smelter. Prior

    Jan 1, 1938

  • CIM
    Characterization of Aluminum Pitting Corrosion Induced by Tropical Climate

    By L. Veleva, Garcia. A., G. Perez

    Aluminum is a metal used for the transmission of electricity of high voltage, in the construction industry and other areas. In atmospheric conditions aluminum forms an oxide layer (Alz03'H20) as

    Jan 1, 2006

  • CIM
    Efficient Scale Up Of Sensor Based Sorting Systems

    By J. Kolacz

    "A new sensor based sorting system has been developed, providing a possibility for laboratory scale testing and further scale-up of the separation results to the industrial operation. The new system c

    Jan 1, 2016

  • CIM
    Ironworking in Upper Canada: Charles Hayes and the Marmora Works

    By Rita Michael

    "The Marmara Ironworks was not the earliest ironworks in Ontario, but it was distinguished from other early works in a number of ways. It was established on an ambitious scale as a self-sufficient and

    Jan 1, 1999

  • CIM
    South Main Shaft at Flin Fion

    By J. P. Caulfield

    THE Hudson Bay Mining and Smelting Company's underground mine at Flin Flon, Manitoba, has in the past been serviced by two working shafts-the North Main shaft, and the No. 3 shaft. The North Ma

    Jan 1, 1941

  • CIM
    Get the Benefits from Control Systems

    By Michel Ruel

    Most plants do not track how their systems perform. Optimization is the easiest way to benefit from your control systems. We suggest an approach in four phases. The first phase is to assess all equipm

    Jan 1, 2019

  • CIM
    Chapter 14. Boilerplate

    By Karl J. C. Harries

    "14.1. INTRODUCTION1The boilerplate of an agreement is not a single provision, but a series of provisions that are expected in “every agreement”. They are sometimes also referred to as the “lawyer’s p

    Jan 1, 2003

  • CIM
    Crusher and inclined conveyor system at Detour Lake Mine

    By P. Hansman

    "Place Dome Canada's Detour Lake Mine is a low-grade gold producer located in northeastern Ontario. Production is targeted for 2850 tonnes of ore per day. As reserves and mining areas continued t

    Jan 1, 1995

  • CIM
    Biomineral Processing of High Apatite Containing Low Grade Indian Uranium Ore

    By Abhilash

    Uranium is conventionally extracted using a process that employs strong acid (H2SO4) and an oxidant (MnO2) as leaching agents. This method often creates environmental problems, requires large amounts

    Aug 1, 2010

  • CIM
    Automation for Improved Safety in Roadside Construction

    By S. Bergquist

    In this paper, it is investigated how different types of automation would affect the safety for workers in asphalt paving. The risk for the workers on road construction sites is consistently high in c

    Aug 1, 2013

  • CIM
    A Projection of Future Energy and Greenhouse Gas Emissions Intensity from Copper Mining

    In this study, we develop a detailed model of the likely future carbon footprint of primary copper supply. We develop a peak copper production model, based on a detailed copper resource data set, and

    Aug 1, 2013

  • CIM
    Mapping the Future of Occupational Health and Safety in the Nigerian Mining Sector

    By Iwueze Anaekperechi Rose

    The International Labor Organization has declared mandatory adequate provision of safe workplace and safety for all workers in all occupations including the mining sector. Early scientists like Agrico

    Aug 1, 2013

  • CIM
    Review Of Industry Best Practices For The Use And Maintenance Of Shaft Ropes On Conventional Drum Hoists And Multi-rope Friction Winders

    By P. G. Smith, A. Axiuk

    The objective of this paper is to present, from a practical perspective, a review of the most relevant maintenance procedures that are accepted or prescribed to be the most effective in optimising ser

    Jan 1, 2023

  • CIM
    Feasibility of Tailings Reclamation for Underground Paste and Hydraulic Backfill Applications

    By K. Tarr

    Acid-producing mine tailings are present at many active and inactive mine sites and pose an environmental liability due to the potential for acid rock drainage. Acid rock drainage originating from a t

    Aug 1, 2013

  • CIM
    Underground Mining at Rio Tinto

    By C. R. Julian

    THE large pyrites ore-bodies, the underground mining of which is to be described, are situated at Rio Tinto in the Province of Huelva in Southern Spain. The situation of the different ore-bodies with

    Jan 1, 1940

  • CIM
    Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Conception et Performance d?un Séchoir à vis Chauffé par Induction Électromagnétique

    By Michel Dostie

    Un séchoir à vis chauffé par induction électromagnétique a été développé et implanté chez Mines Niobec pour le séchage d?un concentré de niobium. Ce séchoir a permis une réduction des émissions de pou

    May 1, 2007

  • CIM
    Canam Deposit

    By W. R. Bacon

    "The Canam property is in southern British Columbia, 24 miles southeast of Hope. It is reached by 5 miles of road from Mile 26 on the Hope-Princeton Highway.Between the years 1930, when the property w

    Jan 1, 1949

  • CIM
    The Preparation of Coal (3d80a8d6-3762-412b-870a-d165227cb7ae)

    By J. B. Morrow

    Methods of Coal Preparation Fundamentally, the object of coal preparation is to increase, economically, the value of a fuel by making it more suitable to the uses of the consumer. This can be accomp

    Jan 1, 1931