Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • CIM
    Challenges in Niobium Flotation

    By S. Kelebek, C. Gibson, M. Aghamirian

    "Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil

    Jan 1, 2015

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed and massive f

    Jan 1, 2012

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    The Cinola Project, Process and Environment

    By C. J. A. Davie

    "SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based

    Jan 1, 1989

  • CIM
    Laboratoire d?analyse des fluids

    By Valérie Tremblay

    Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;

    Feb 1, 2008

  • CIM
    Integrated Operations for Maximizing Results

    By D. Schleiss

    Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an

    Jan 1, 2014

  • CIM
    The Colomac Project

    By V. N. Bryant

    "1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec

    Jan 1, 1990

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • CIM
    Review of Statistical Design of Experiments 1n Metallurgical Engineering

    By M. C. Makepeace

    "It is the objective of designed experiments to obtain more information for less material and process cost than can be obtained by traditional experimentation. In this paper, the fundamental concepts

    Jan 1, 1967

  • CIM
    Preliminary Results for Investigating Time-Dependent Behaviour within the Block Cave Mining System Using Virtual Reality Scientific Visualisation

    Block caving is an underground mining method for the profitable extraction of massive, low-grade orebodies. Lately, it has become the mining method of choice, for many mining companies, because of dep

    Jan 1, 2015

  • CIM
    The Marketing of Nickel

    By K. H. J. Clarke

    "ALTHOUGH nickel was not identified as a separate element until a Swedish scientist, Axel Frederick Cronstedt, did so in 17 51, its utilization dates from pre-historic times. From its humble beginning

    Jan 1, 1960

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM Project

    By Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming

    "This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui

    Jan 1, 2015

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003