Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recent Developments in the Gravity Concentration of Gold at Peko Mines LTD, Warrego N.T.

    From August 1962 to June 1976 Peko Mines Ltd. produced Gold Bullion at the Peko Control Mill using 18x24 Denver Mineral Jigs and strake tables. Gold ores treated during this period were obtained fr

    Jan 1, 1978

  • AUSIMM
    Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom Price

    By J Austin, R Bitencourt

    Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month

    Jan 1, 2005

  • AUSIMM
    Ground Control Hazard Analysis in Multi-Seam Mining

    By Zhou Y, Karmis M, Haycocks C

    Hazard analysis utilizes interaction mecha- nisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using charac

    Jan 1, 1992

  • AUSIMM
    Investigations and Improvements to Ground Control Systems Used at Xstrata Copper ù Mount Isa Copper Operations

    By B Andrew, L Krois

    Ground control systems, including ground control management, play an integral role in the effective and efficient extraction of copper ore at the Xstrata Copper û Mount Isa Copper Operations (MICO). R

    Jan 1, 2005

  • AUSIMM
    Mineral Taxation Policies and Practices Around the Pacific Rim

    This paper examines some of the important aspects of mineral taxation policies and practices, with reference to the mining tax regimes of selected Pacific Rim countries (see Tables 1 and 2). The follo

    Jan 1, 1999

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999

  • AUSIMM
    Kidston Waste Rock Dump Design and æStore and ReleaseÆ Cover Performance Seven Years On

    By G W. Wilson, P Ritchie, N A. Currey

    The design and rehabilitation of potentially acid forming (PAF) waste rock dumps is site specific, being a function, among other factors, of the rock types, the dumping and storage method employed, an

    Jan 1, 2003

  • AUSIMM
    Computer Techniques Coal Deposit Evaluation

    By Robinson WB

    An accurate and rapid assessment of coal resources, such as that provided by computer modelling, forms an intergral role in evaluating CSR's coal deposits for future development. An in-house

    Jan 1, 1983

  • AUSIMM
    Application of Engineering Discipline and a Full-process Optimisation Focus – Productivity to Profitability without Profuse Pruning

    By W R. Adamson

    "Optimisation of drill and blast design and engineering can deliver a significant positive impact on the profitability of any mining operation; however, true engineering of the blasting process is les

    Aug 24, 2015

  • AUSIMM
    The Structural and Hydrodynamic Framework for Epithermal Exploration

    By M A. Etheridge

    The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous deform

    Jan 1, 1995

  • AUSIMM
    Recognising False Anomalies in Drillhole EM

    By Morland R

    In the course of an exploration program aimed at increasing Pasminco Mining's ore reserves, an electromagnetic survey down one of the underground drillholes at the North Mine, Broken Hill, record

    Jan 1, 1994

  • AUSIMM
    Practical Ventilation Planning for Mine Management Using a Digital Computer

    By Hempenstall J, English W

    Mine management has a responsibility under the various acts of state parliaments for the adequate ventilation of existing workings. It also has a need to plan adequately for the ventilation of pro

    Jan 1, 1983

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids (7e54b8c0-a935-48c5-857a-f805178a4625)

    By Ramsay WRH, Morand V

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (Dl) predate

    Jan 1, 1995

  • AUSIMM
    The Otago Schist, New Zealand and the Klondike Schist, Canada û A Comparison of Two Historic Gold Fields

    By D Craw

    Otago Schist and Klondike Schist are two Paleozoic-Mesozoic metamorphic belts on the circum-Pacific margin in which there has been a long history of abundant alluvial gold mining, but only minor hard-

    Jan 1, 2007

  • AUSIMM
    A Geotechnical Data Management System for Surface and Underground Mines

    By Brant BA, Lewandowski R, Trendle M, Haughton D

    There is a vast amount of geotechnical data, which can be obtained during exploration programs at new and existing mine sites. Additional information on the performance of the in-situ rock mass can

    Jan 1, 1983

  • AUSIMM
    Collective Mine Water Reclamation and Reuse - Upper Olifants River Catchment

    By P Gnnther, A M. van Niekerk

    Coal mining operations in the Upper Olifants River Catchment in the Mpumalanga Province of South Africa are challenged with the increasing production of excess mine water that cannot be fully managed

    Jan 1, 2006

  • AUSIMM
    "Computer Simulation of the Direct Iron Reductionin MIDREX Ovens"

    By A T. Bernardes

    Using the cellular automata computational technique it was possible to simulate the generation and discharge of an iron ore pellet pile inside a direct iron reduction oven, as well as to calculate the

    Sep 26, 2011

  • AUSIMM
    Experiments with a Cylinder-Cyclone System for Classification at Coarse Sizes

    By Restarick C, Jowett A

    A cylinder-cyclone system, fitted with a flow control valve between the cylinder and cyclone plus in some tests a variable cyclone spigot, has been used to achieve classifier separations at unusual

    Jan 1, 1978

  • AUSIMM
    High-resolution erosion modelling using the RUSLE – an application to open cut coalmine operations

    By C M. Côte, P Bolz, R Chrystal

    The design of final landforms is an integral part of mine closure plans in Queensland and aims to ensure the rehabilitated land is safe, stable and non-polluting. Landform stability in this context is

    Aug 2, 2023

  • AUSIMM
    Forecast the mineral processing destinations based on spatial interpolation of geometallurgical variables

    By N Madani, Y Abildin, E Topal

    Mine planning is a crucial part of all mining industry projects, and nowadays, geometallurgical mapping through advanced computer technologies provides an opportunity to involve metallurgical response

    Nov 21, 2018