Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Flyash Cement in Mining Backfill Material

    By K Matsui, T Sasaoka, S Kubota, Y Yosh

    A large amount of wastes from the preparation plant is produced. The properties of these wastes vary depending on the mineralogical contents of the mother rock in which the coal is embedded. The waste

    Jan 1, 2003

  • AUSIMM
    Mine Rehabilitation: An Economic Perspective on a Technical Activity

    By Cox A

    A key concern both in public perceptions of the environmental performance of the mining industry and in the development of policy relating to mining activities is the state in which the areas may be l

    Jan 1, 1992

  • AUSIMM
    A coupled gas flow-geomechanical model based on energy analysis in coal and gas outburst simulation

    By F Soleimani

    Coal and gas outburst is a common hazard in coalmines and due to the complexity of its nature, efficaciously predicting the possibility of its occurrence is intricate. The mechanical and gas flow prop

    Oct 12, 2022

  • AUSIMM
    Dry and Wet Sample Recovery in Rotary Percussion Drilling

    An improved method of sample recovery for use with rotary percussion drilling has been developed. Cuttings can be recovered continuously from either dry or wet drilling, and the recovery under dr

    Jan 1, 1976

  • AUSIMM
    What Causes Cracks in Rock Blasting?

    By S Nie, I Bergqvist, F Ouchterlony

    In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial

    Jan 1, 2001

  • AUSIMM
    Project Feasibility Studies - A Necessary Step or the Best Opportunity to Add Value and Certainty?

    By J Borthwick, M Yusi, M Douge

    Feasibility studies form a vital and significant component of the project delivery cycle. They are at the heart of the valuation process. This paper focuses on variables which can affect a project and

    Jan 1, 2009

  • AUSIMM
    Mining and Health in Development - An Inventory of Global Resource Industry Health Initiatives in Developing Countries

    By J Harris, P Kirsch, R LaBouchardiere

    æMining + Health in DevelopmentÆ is a project funded by the International Mining for Development Centre (IM4DC, 2012) to develop a centralised database of corporate sustainability initiatives for mana

    Nov 20, 2012

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    Gold Deposits of the Russian North East (The Northern Circum Pacific): Metallogenic Overview

    North Eastern Russia encompasses the northern part of the Circum Pacific. The region comprises various tectonostratigraphic terranes, including cratonic blocks, fragments of volcanic arcs, accretionar

    Jan 1, 1999

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine (5ba8492f-dd77-4906-9379-17f94c93e0d9)

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices and o

    Jan 1, 1999

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices andop

    Jan 1, 1999

  • AUSIMM
    The Use of Customer Operated Bulk Emulsion Systems for Improved Productivity at the Tara Underground Operations

    By A Suokas

    Boliden Tara Mines Ltd, located in County Meath Ireland, produce in excess of 2.5 million tonnes per annum of ore from the underground resource located 40 miles north west of Dublin. The zinc-lead ore

    Jan 1, 2005

  • AUSIMM
    Ecological Outlook for the New Technology of the Copper-Nickel Ore Benefication Based on the Flotation with Nitrogen

    By Mantsevich M, Ivanov V, Volkov V, Ponomarov G

    A new ecologically promising technology for the copper-nickel ore benefication using insert gases and pyrrhotite depression is under consideration. The finely dispersed nickel-containing sulphides

    Jan 1, 1993

  • AUSIMM
    Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium Mine

    The Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of

    Jan 1, 2002

  • AUSIMM
    Salt Dissolution Dynamics on Surface Mine Spoils

    By S Vink, V Nanjappa, C J. Moran

    Poor quality water resulting from interaction of surface run-off with saline mine spoil and soils can cause significant problems for water reuse on mine sites. Not only can this saline water lead to m

    Jan 1, 2009

  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    A Review of the Acid Rock Drainage Potential and Hydrological Implications of Selectively-Placed Waste Rock at a Gold Mine in NSW, Australia

    By J Jeffrey, G W. Wilson, L Gilbert, C

    Prior to the commencement of mining, the acid rock drainage (ARD) potential of the waste rock to be produced by an open cut mining operation is assessed by a variety of techniques carried out on drill

    Jan 1, 2003

  • AUSIMM
    Industrial Strength Optical Image Analysis System - Mineral4/Recognition4

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    ################

    Aug 12, 2013

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    Standardisation of Mine Control at Newmont Australia Underground Sites

    By B Ascott

    As a prerequisite to achieving integrated regional production reporting across multiple sites, Newmont Australia initiated a project to standardise the configuration and use of mine control systems at

    Jan 1, 2008