Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing uncertainty in large open pit geotechnical modelling

    By R Hao

    Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,

    Jun 22, 2022

  • AUSIMM
    Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC Code

    By G M. Jeffress, D C. Arne

    There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,

    Jul 29, 2014

  • AUSIMM
    State and Development Trends of EDP-Based Operation Monitoring and Remote Control in the Coal Mining Industry of the Federal Republic of Germany

    By Stuedel J

    Starting from comprehensive programme systems for monitoring tasks of any kind, this paper follows the steps of the programme system hierarchy from top to bottom. The monitoring and control centres fo

    Jan 1, 1985

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Native Title and Exploration Access - Where Are We Now and Where Are We Going?

    In June 1992, the High Court of Australia recognised native title of the Meriam people over parts of the Mer Island in the Torres Strait as a form of common law. The Court also indicated that native

    Jan 1, 1996

  • AUSIMM
    Syntectonic Base-Metal Mineralisation with an Epithermal Gold Overprint: McKinnons Gold Deposit, Cobar, NSW, Australia

    By P K. Seccombe

    The McKinnons gold deposit is hosted by weakly deformed, Palaeozoic metasedimentary rocks of the Cobar Basin in the western Lachlan Fold Belt of New South Wales. Mineralisation comprised a largely sup

    Jan 1, 1999

  • AUSIMM
    El Teniente New Mine Level Project

    By R Pozo, F Reyes

    Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo

    Jan 1, 2008

  • AUSIMM
    Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal Smelters

    By I KylmSkorpi, H Mansikkaviita

    The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se

    Jan 1, 2008

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Diesel Exhaust and the Underground Miner in Western Australia

    By O Jones

    Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and

    Aug 31, 2015

  • AUSIMM
    Developing a Copper Mine in a Developing Country

    Designing and constructing OxianaÆs Sepon gold and copper operations in one of the most remote areas in Laos has been a great achievement; one which was recognised by the engineering industryÆs highes

    Jan 1, 2006

  • AUSIMM
    Timescale of Forming a Giant Porphyry Copper-Gold Deposit - Ok Tedi, Papua New Guinea

    By R F. Weinberg, R A. Armstrong, A G. Tomkins

    We investigated the duration of formation of the giant Ok Tedi porphyry copper-gold deposit in Papua New Guinea using zircon SHRIMP U-Pb dating. The intrusions that host the Cu-Au mineralisation have

    Jan 1, 2008

  • AUSIMM
    Case studies for integrating rehabilitation planning with mine planning in strip mining

    By I Neilsen, A Walker, A Hooper

    Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H

    Jul 25, 2018

  • AUSIMM
    Opening Address (4fc0e779-316e-4db8-aaa5-252d75d83c07)

    Welcome to Mount Isa- my home city and without doubtthe base for what promises to be the most exciting mineral development yet seen in Australia.Mr. Chairman, it also gives me great pride to represent

    Jan 1, 1993

  • AUSIMM
    Stope Cleaning - Historical Methods

    In classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.

    Aug 1, 2010

  • AUSIMM
    Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project

    By R Godard, J Gantumur, F Prince, C Pascoe

    Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera

    May 9, 2016

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • AUSIMM
    The possibility of using an autogenous Hydrogen-DRI slag as a raw material for vanadium extraction

    By N Kojola, A Vickerfält, J Huss

    The possibility of using an acidic autogenous hydrogen direct reduced iron (H-DRI) slag as a basis for vanadium extraction is investigated. For a raw material to be suitable for producing high-quality

    Jun 19, 2024

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016