Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Managing uncertainty in large open pit geotechnical modellingBy R Hao
Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,
Jun 22, 2022
-
Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC CodeBy G M. Jeffress, D C. Arne
There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,
Jul 29, 2014
-
State and Development Trends of EDP-Based Operation Monitoring and Remote Control in the Coal Mining Industry of the Federal Republic of GermanyBy Stuedel J
Starting from comprehensive programme systems for monitoring tasks of any kind, this paper follows the steps of the programme system hierarchy from top to bottom. The monitoring and control centres fo
Jan 1, 1985
-
Strategies for Mine Planning and DesignBy S Coward, C Xu, P A. Dowd
"This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif
Nov 24, 2014
-
Native Title and Exploration Access - Where Are We Now and Where Are We Going?In June 1992, the High Court of Australia recognised native title of the Meriam people over parts of the Mer Island in the Torres Strait as a form of common law. The Court also indicated that native
Jan 1, 1996
-
Syntectonic Base-Metal Mineralisation with an Epithermal Gold Overprint: McKinnons Gold Deposit, Cobar, NSW, AustraliaBy P K. Seccombe
The McKinnons gold deposit is hosted by weakly deformed, Palaeozoic metasedimentary rocks of the Cobar Basin in the western Lachlan Fold Belt of New South Wales. Mineralisation comprised a largely sup
Jan 1, 1999
-
El Teniente New Mine Level ProjectBy R Pozo, F Reyes
Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo
Jan 1, 2008
-
Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal SmeltersBy I KylmSkorpi, H Mansikkaviita
The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se
Jan 1, 2008
-
Mining Network and the Security QuestionBy A Huebner, A Noack
Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc
Sep 26, 2011
-
Diesel Exhaust and the Underground Miner in Western AustraliaBy O Jones
Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and
Aug 31, 2015
-
Developing a Copper Mine in a Developing CountryDesigning and constructing OxianaÆs Sepon gold and copper operations in one of the most remote areas in Laos has been a great achievement; one which was recognised by the engineering industryÆs highes
Jan 1, 2006
-
Timescale of Forming a Giant Porphyry Copper-Gold Deposit - Ok Tedi, Papua New GuineaBy R F. Weinberg, R A. Armstrong, A G. Tomkins
We investigated the duration of formation of the giant Ok Tedi porphyry copper-gold deposit in Papua New Guinea using zircon SHRIMP U-Pb dating. The intrusions that host the Cu-Au mineralisation have
Jan 1, 2008
-
Case studies for integrating rehabilitation planning with mine planning in strip miningBy I Neilsen, A Walker, A Hooper
Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H
Jul 25, 2018
-
Opening Address (4fc0e779-316e-4db8-aaa5-252d75d83c07)Welcome to Mount Isa- my home city and without doubtthe base for what promises to be the most exciting mineral development yet seen in Australia.Mr. Chairman, it also gives me great pride to represent
Jan 1, 1993
-
Stope Cleaning - Historical MethodsIn classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.
Aug 1, 2010
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectBy R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
The possibility of using an autogenous Hydrogen-DRI slag as a raw material for vanadium extractionBy N Kojola, A Vickerfält, J Huss
The possibility of using an acidic autogenous hydrogen direct reduced iron (H-DRI) slag as a basis for vanadium extraction is investigated. For a raw material to be suitable for producing high-quality
Jun 19, 2024
-
In support of frontline leadersBy A Kite
Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi
May 5, 2022
-
Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage FacilityBy K Brand, M J. Ind, M Rynhoud
Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca
Jun 28, 2016