Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Applying enhanced grade engineering to complex ore bodies

    By R Morrison, P Walters, B Adair, V Jokovic

    ‘Grade Engineering<sub>®</sub> is an integrated approach to coarse rejection that matches a suite of separation technologies to ore specific characteristics and compares the net value

    Nov 21, 2018

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Gold Mining and Exploration in South America -- An Overview

    Gold mine production in South America was 247.3 tonnes in 1995 up from 156.4 tonnes ten years earlier in 1986. This represents a 58 per cent increase and amounted to 11 per cent of total world gold mi

    Jan 1, 1997

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    Trends in Magnetite Ore Processing and Test Work

    By D Yan, D Connelly

    Beneficiation of magnetite is an integral part of the future of iron ore processing. Historically, the focus of Western Australian producers has been on exporting direct shipping ore (DSO) namely haem

    Jan 1, 2009

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Dense Medium Separation at Mt Newman

    The Mt Newman Beneficiation Plant uses a combination of heavy media deans, heavy medium cyclones and Reichert cones to produce saleable iron ore concentrates from low grade iron ores. The aim of t

    Jan 1, 1987

  • AUSIMM
    Improved recoveries and environmental outcomes from complex ores utilising EcoTechnology

    By M Noakes

    EcoTechnology refers to a series of potential metallurgical processes for complex ores, concentrates, tailings and slags that are all based on an initial chlorination step at low to moderate temperatu

    Nov 21, 2018

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion risk

    By B Waldon, M Valastro

    A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex

    Apr 16, 2024

  • AUSIMM
    A new look at detrital iron deposit geology of the Hamersley Province of Western Australia

    By C Simpson, J M. F Clout, G Plummer

    Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product

    Nov 8, 2021

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Geometallurgy – Beyond Conception

    By L O’Connor, S C. Dominy

    "Geometallurgy is an important addition to any evaluation project or mining operation. As a discipline, it seeks to maximise the net present value (NPV) of an orebody while minimising technical and op

    Jun 15, 2016

  • AUSIMM
    Coke Bed and Liquid Flow in the Lower Part Dissected No. 1 Blast Furnace at Chiba Works

    By Konishi Y, Morioka Y, Okabe K

    A part of the results of dissection survey of Chiba No.1 blast furnace, Kawasaki Steel Corporat- ion, is presented. Distributions of coke size and of slag and metal holdup are shown in the region of

    Jan 1, 1981

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    Characterisation and assessment of B2O3 added LF slag

    By S Kakara, A Kamaraj, S S. Varanasi, B V. R Mandalika, M B. Shaik

    The properties of top slags play a very important role in secondary steelmaking. Fluxes should be chosen based on the ladle furnace (LF) slag requirements like viscosity, melting temperature, sulfide

    Aug 21, 2024